Inspections for the day of: Tuesday, January 22, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02680 BLD-Framing/Rough-in1/18/20021/22/20021/22/2002 12:00:00 AMAPASS
charles ###-#### fr insp all c/n items completed ok to cover 1/22/2002 9:45:27 AM
BLD01-02680 BLD-Energy code compliance1/18/20021/22/20021/22/2002 12:00:00 AMAPASS
charles ###-####
MEC02-00006 Rough-in1/18/20021/22/20021/22/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/18/2002 at 14:59:45. Contact: .
MEC02-00158 Rough-in1/21/20021/22/20021/22/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/21/2002 at 12:03:39. Contact: ###-####.
MEC02-00158 Pressure Test1/21/20021/22/20021/22/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/21/2002 at 12:04:03. Contact: ###-####. high side pa 1/22/2002 11:01:07 AM s 1/22/2002 11:01:08 AMed low failed 1/22/2002 11:01:42 AM
BLD01-02399 BLD-Footing1/21/20021/22/20021/22/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/21/2002 at 12:58:54. Contact: ###-####. mti has done inspection and pulled concrete sample 1/23/2002 9:08:14 AM
BLD01-03084 BLD-Framing/Rough-in1/22/20021/22/20021/22/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/22/2002 at 07:42:05. Contact: ###-####.c/n items completed 1/22/2002 3:07:25 PM
BLD02-00051 BLD-Footing1/22/20021/22/20021/22/2002 12:00:00 AMPPART
###-#### crew justs starting looked over plans with contractor will need to check setbacks on stem wall pour 1/22/2002 3:10:40 PM
BLD01-01668 BLD-Other1/22/20021/22/20021/22/2002 12:00:00 AMPFAIL
FIRE WALL ###-#### areas with elec note covered rock not screwed to spec 1/22/2002 3:09:08 PM
BLD01-03084 BLD-Energy code compliance1/22/20021/22/20021/22/2002 12:00:00 AMPPASS
Added by Inspector: 425 On 1/22/2002 3:07:43 PM