Inspections for the day of: Wednesday, January 22, 2003.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03634 BLD-Aging Inspection1/22/20031/22/20031/22/2003 12:00:00 AM PASS
previously finalled by 415 & 409 1/22/2003 9:16:05 AM
BLD00-03715 BLD-Aging Inspection1/22/20031/22/20031/22/2003 12:00:00 AM PASS
hvac permit pulled/finalled...expire 1/22/2003 9:13:47 AM
BLD01-00170 BLD-Aging Inspection1/22/20031/22/20031/22/2003 12:00:00 AM PASS
restrooms w/ ph 1 1/22/2003 8:56:22 AM...final ok 1/22/2003 8:57:01 AM
BLD02-02566 BLD-Conference1/21/20031/22/20031/22/2003 12:00:00 AMACANC
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-02760 BLD-Concrete1/21/20031/22/20031/22/2003 12:00:00 AMAPART
###-#### call first to meet there...col pads ok 1/22/2003 1:56:58 PM
BLD02-01930 BLD-Final1/21/20031/22/20031/22/2003 12:00:00 AMAPART
###-####...verify elec, ok for t/o. 1/22/2003 11:35:18 AM
BLD02-02443 BLD-Final1/21/20031/22/20031/22/2003 12:00:00 AMAPART
###-####...facade & efis...verify P&Z, struct ok 1/22/2003 11:39:40 AM
BLD02-01930 BLD-Final1/22/20031/22/20031/22/2003 12:00:00 AMANR
verify hvac final... 1/22/2003 11:40:09 AM
BLD02-02443 BLD-Conference1/22/20031/22/20031/22/2003 12:00:00 AMAPASS
rec'd eng'g... 1/22/2003 9:35:31 AM
BLD02-01928 BLD-Conference1/22/20031/22/20031/22/2003 12:00:00 AMAPASS
w/ bldr...will need lever set hdwe for c/o 1/22/2003 11:51:35 AM
BLD02-02379 BLD-Framing/Rough-in1/22/20031/22/20031/22/2003 12:00:00 AMPFAIL
if possible call gary to meet at site; Phone #: ###-#### Internet Inspection Request from: Gary Gettman c/n air seal, complete hvac c/n...partial only (garage), house locked. 1/22/2003 5:00:09 PM 1/22/2003 5:29:15 PM
BLD02-02174 BLD-Footing1/22/20031/22/20031/22/2003 12:00:00 AMPPART
monty; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...c/n issued...flash deck ledgers...ftgs ok, still need photos for previously poured ftg 1/22/2003 3:53:56 PM
BLD02-02760 BLD-Foundation1/22/20031/22/20031/22/2003 12:00:00 AMPPART
masonry...1st lift cols...steel ok 1/22/2003 2:55:30 PM
BLD02-02575 BLD-Footing1/22/20031/22/20031/22/2003 12:00:00 AMPPART
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung....grade beams for shore braces, steel/compaction ok, pending MTI report. 1/22/2003 2:13:50 PM
BLD02-02712 BLD-Framing/Rough-in1/22/20031/22/20031/22/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/22/2003 at 08:31:18. Contact: ###-####....c/n, sills not attached to fnd, fnd poured w/o insp ( detail shows rigid insul.) winder (not per plans) fireblocks, header needed at stair...no cover. 1/22/2003 4:19:18 PM
BLD02-02566 BLD-Conference1/22/20031/22/20031/22/2003 12:00:00 AMPPASS
larry, advised owner/arch to resubmit for proposed exit change...joining bldgs may allow review as one occupancy...for exiting. keep c/n til resolved. 1/22/2003 2:43:47 PM