Inspections for the day of: Monday, January 22, 2007.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00540 INSP-Sprinkler Rough-in/Hydro1/19/20071/22/20071/22/2007 4:42:23 PMPPART
Inspection for overhead rough-in at the 4th floor SW quad is acceptable pending the installation of missing retaining straps at several locations on branch lines and arm-overs in the SW corner of this quadrant, hydrostatic test for the south half of the 4th floor passed.
FIR06-00910 INSP-Final Inspection1/22/20071/22/20071/22/2007 4:39:17 PMPFAIL
Pendent head at the main entry is not correctly installed, provide consistent temp. ratings of sprinklers installed at common fire areas, rough-in at the kitchen drop ceilings is good for cover.
FIR06-00782 INSP-Sprinkler Rough-in/Hydro1/22/20071/22/20071/22/2007 4:00:29 PMPPART
OH hydrostatic test is satisfactory, noted one head in the riser room to be changed to an intermediate temp. due to high ambient heat conditions, as-built plans need to reflect deletion of the SW heads at garage doors no longer of the overhead type, need to complete forward flow prior to final approval.
FIR06-00451 INSP-Final Inspection1/22/20071/22/20071/22/2007 3:56:38 PMPFAIL
The flow switch is not powered or connected to the outside bell as required.
FIR06-00954 INSP-Sprinkler Rough-in/Hydro1/19/20071/22/20071/22/2007 2:33:41 PMPCANC
Overbooked, no time available to complete this inspection today. Notified contact to reschedule per phone conversation.
FIR06-00920 INSP-Final Inspection1/22/20071/22/20071/22/2007 2:31:12 PMPFAIL
The PIV tamper switch is not correctly installed or adjusted, also lacking NFPA 72 record of inspeciton and testing to be completed (per review comments) prior scheduling final field acceptance test.
FIR06-00660 INSP-Final Inspection1/18/20071/22/20071/22/2007 2:25:28 PMAFAIL
The PIV tamper switch is not installed correctly, contractor to provide means for testing forward flow.
FIR06-00660 INSP-Sprinkler Rough-in/Hydro1/18/20071/22/20071/22/2007 2:18:04 PMAPART
UG fire supply line hydrostatic test passed inspection.
FIR06-00983 INSP-Sprinkler Rough-in1/19/20071/22/20071/22/2007 1:36:23 PMAPART
Fire sprinkler rough-in at the grid ceiling areas are good for cover.
FIR06-00024 INSP-Sprinkler Rough-in/Hydro1/19/20071/22/20071/22/2007 11:10:48 AMADEFR
Wrong permit number called in for inspection by the contractor, was intended for FIR06-00782 Guerdon warehouse hydro and OH rough-in.
FIR06-00449 INSP-Sprinkler Rough-in1/19/20071/22/20071/22/2007 10:26:42 AMAPART
OH rough-in for building A-1 wet and antifreeze systems is satisfactory. Contractor also completed UG supply line hydrostatic test acceptable.
FIR06-01018 INSP-Final Inspection1/19/20071/22/20071/22/2007 9:48:09 AMAPART
Fire sprinkler work at the drop ceilings within the TI space are approved for cover.
MIS06-00336 FIR-Final1/19/20071/22/20071/22/2007 9:26:13 AMAPASS
Fire life safety final inspeciton passed.
MIS06-00335 FIR-Final1/19/20071/22/20071/22/2007 9:25:41 AMAPASS
Fire life safety inspection passed.
MIS06-00334 FIR-Final1/19/20071/22/20071/22/2007 9:25:13 AMAPASS
Fire life safety finaled.
FIR06-00954 INSP-Sprinkler Rough-in/Hydro1/19/20071/22/20071/19/2007 3:56:26 PMACANC
Bret; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt Inspection cancelled from web by: Victoria Beall
FIR06-00851 INSP-Final Inspection1/19/20071/22/20071/19/2007 1:21:53 PMACANC
Phone #: ###-#### Inspection cancelled from web by: Terry Owsley