MEC09-00118
| Final | 1/22/2009 | 1/22/2009 | 1/22/2009 3:56:10 PM | P | PASS |
|
|
PHONE# IS TO CUSTOMER, LATE PM PLEASE, INSTALLER GETTING LATER START, THANKS Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe
|
MEC09-00107
| Pressure Test | 1/22/2009 | 1/22/2009 | 1/22/2009 3:23:20 PM | P | PASS |
|
|
Kip Phone #: ###-#### 20# test
|
MEC09-00119
| Rough-in | 1/22/2009 | 1/22/2009 | 1/22/2009 3:23:01 PM | P | FAIL |
|
|
Please do rough in and final inspection for furnace change out. Please call for access if needed. Thank you! Phone #: ###-#### Internet Inspection Request from: Donnette Ellis need to know where the condensate drains too and electrical not complete
|
MEC08-03687
| Rough-in | 1/22/2009 | 1/22/2009 | 1/22/2009 2:47:02 PM | P | PASS |
|
|
michael Note: if possible Mid-Afternoon - late Phone #: ###-#### ok to cover exhaust ducts
|
MEC09-00105
| Rough-in | 1/22/2009 | 1/22/2009 | 1/22/2009 2:24:18 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: GREG ANDERSEN still need smoke detector for rtu
|
MEC08-01240
| Final | 1/21/2009 | 1/22/2009 | 1/22/2009 11:03:38 AM | A | PART |
|
|
Rocky Mitchell is the field contact. We need a final inspection on Level 5. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet ok final on 6th floor for dry and wet mechanical
|
MEC08-00640
| Final | 1/20/2009 | 1/22/2009 | 1/22/2009 10:29:08 AM | A | FAIL |
|
|
scott Phone #: ###-#### exposed metal duct needs to be insulated in garage and need 90 fitting to air intake
|
MEC08-03198
| Final | 1/20/2009 | 1/22/2009 | 1/22/2009 10:09:05 AM | A | PASS |
|
|
JOB CONTACT IS AB JENSEN Phone #: ###-#### Internet Inspection Request from: ADAM WARR gas pipe connected to one unit only
|
MEC09-00020
| Final | 1/21/2009 | 1/22/2009 | 1/22/2009 9:43:56 AM | A | PASS |
|
|
meet at 9:00am
|
MEC09-00021
| Final | 1/21/2009 | 1/22/2009 | 1/22/2009 8:47:20 AM | A | PASS |
|
|
meert at 9:00am
|