FIR12-00080
| FIR-Aging Inspection | 1/22/2013 | 1/22/2013 | 1/25/2013 7:47:47 AM | | NR |
|
|
Per steve this will be scheduled soon
|
FIR12-00077
| FIR-Aging Inspection | 1/22/2013 | 1/22/2013 | 1/24/2013 3:42:25 PM | | NR |
|
|
Per steve these DSC permits will all be scheduled shortly. Maps for the facp and other paperwork is being finished.
|
FIR12-00076
| FIR-Aging Inspection | 1/22/2013 | 1/22/2013 | 1/24/2013 3:42:00 PM | | NR |
|
|
Per steve these DSC permits will all be scheduled shortly. Maps for the facp and other paperwork is being finished.
|
FIR12-00421
| INSP-Sprinkler Rough-in | 1/16/2013 | 1/22/2013 | 1/23/2013 3:07:49 PM | A | PASS |
|
|
Piping is ok to cover.
|
FIR12-00741
| INSP-Final Inspection | 1/18/2013 | 1/22/2013 | 1/22/2013 10:35:10 AM | A | PASS |
|
|
permit finaled
|
BLD12-01141
| FIRE-Final Inspection | 1/18/2013 | 1/22/2013 | 1/22/2013 8:48:36 AM | A | PASS |
|
|
Life safety passed
|
FIR12-00362
| INSP-Final Inspection | 1/22/2013 | 1/22/2013 | 1/22/2013 8:47:46 AM | A | PASS |
|
|
Permit finaled. The coverings on two upright heads was removed while I waited.
|