ELE14-03558
| Final | 1/20/2015 | 1/22/2015 | 1/22/2015 12:40:14 PM | A | PASS |
|
|
Call Rustin (the electrician on site) Phone #: ###-#### Inspection requested via web by Jessica Powell final ok
|
ELE14-02239
| Final | 1/21/2015 | 1/22/2015 | 1/22/2015 11:55:29 AM | A | PASS |
|
|
final Phone #: ###-#### Inspection requested via web by Andy Rose 2510 and 2516 power already on. final ok on both units
|
ELE13-01291
| Electrical Rough-In | 1/21/2015 | 1/22/2015 | 1/22/2015 11:06:04 AM | A | PASS |
|
|
Call Brandon for level 5 rough in Phone #: ###-#### Inspection requested via web by Tom Betty r/i ceiling ok movement corridor. Also discuss lighting control panel ok not to bring nuetrals into control panel with Toby. Also discuss conduits in front of transformer "not in the way of working space" and is ok with Dennis.
|
ELE14-03052
| Final | 1/21/2015 | 1/22/2015 | 1/22/2015 9:35:57 AM | A | PASS |
|
|
Call for entry. Thanks Phone #: ###-#### Inspection requested via web by Greg Idsinga final ok
|
ELE14-03024
| Final | 1/21/2015 | 1/22/2015 | 1/22/2015 9:07:16 AM | A | PASS |
|
|
Added new grounding electrode conductor from panel To existing ground and (1) ground rod that we added. Bonded to cold water pipe in crawl space also. Phone #: ###-#### Inspection requested via web by Lars Johnson corrections made final ok
|
GCE15-00013
| GCE-Rough-In | 1/21/2015 | 1/22/2015 | 1/22/2015 8:48:43 AM | A | PASS |
|
|
Marinko ###-#### r/i ok ul listed materials
|
GCE15-00005
| GCE-Final | 1/21/2015 | 1/22/2015 | 1/22/2015 8:47:36 AM | A | PASS |
|
|
Mike ###-#### r/i ok ul listed products
|