BLD14-03437
| FIRE-Final Inspection | 1/22/2015 | 1/22/2015 | 1/22/2015 3:03:22 PM | P | PASS |
|
|
life safety passed.
|
FIR14-00902
| INSP-Sprinkler Rough-in | 1/22/2015 | 1/22/2015 | 1/22/2015 2:41:10 PM | P | PASS |
|
|
Tenting passed. Piping can be covered.
|
NAF14-00018
| INSP-Final | 1/21/2015 | 1/22/2015 | 1/22/2015 2:17:06 PM | P | CANC |
|
|
Cancel per Matt Casey
|
FIR14-00539
| INSP-Sprinkler Rough-in/Hydro | 1/21/2015 | 1/22/2015 | 1/22/2015 2:01:24 PM | A | PASS |
|
|
Overhead hydro test passed
|
GCB14-00124
| FIRE-Final Inspection | 1/21/2015 | 1/22/2015 | 1/22/2015 1:29:27 PM | A | FAIL |
|
|
Could not make contact with contractor on site. Could not find approved drawings. Left message on contractors phone. Call prior to going Phone #: 2088701943 >> Cou Kyle Cooper
|
BLD14-03135
| FIRE-Conference | 1/21/2015 | 1/22/2015 | 1/22/2015 12:58:37 PM | A | DONE |
|
|
Went over sprinkler and fire alarm device placement for the new conference room. Keith Phone # ###-####
|
FIR14-00538
| INSP-Final Inspection | 1/21/2015 | 1/22/2015 | 1/22/2015 12:56:34 PM | A | CANC |
|
|
Not ready for final due to missing facp
|
FIR14-00539
| INSP-Final Inspection | 1/21/2015 | 1/22/2015 | 1/22/2015 12:56:13 PM | A | CANC |
|
|
Not ready for final due to missing facp
|
FIR14-00905
| INSP-Final Inspection | 1/21/2015 | 1/22/2015 | 1/22/2015 11:47:16 AM | A | PASS |
|
|
Permit finaled
|
FIR14-00541
| INSP-Supply line flush | 1/21/2015 | 1/22/2015 | 1/22/2015 11:08:36 AM | A | PASS |
|
|
underground flush passed
|
FIR14-00540
| INSP-Supply line flush | 1/21/2015 | 1/22/2015 | 1/22/2015 11:07:00 AM | A | PASS |
|
|
Underground flush passed
|
FIR14-00817
| INSP-Final Inspection | 1/22/2015 | 1/22/2015 | 1/22/2015 10:58:49 AM | P | PASS |
|
|
Permit finaled
|
FIR14-00817
| INSP-Final Inspection | 1/21/2015 | 1/22/2015 | 1/22/2015 12:00:00 AM | A | CANC |
|
|
Lerren Phone #: ###-####
|