Inspections for the day of: Friday, January 22, 2016.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00548 INSP-Supply line flush1/21/20161/22/20161/22/2016 12:51:49 PMACANC
Supply line flush cancelled per conversation with Matt, phone number ###-####, will reschedule for another date.
FIR15-00553 INSP-Supply line flush1/21/20161/22/20161/22/2016 12:50:52 PMACANC
Supply line flush cancelled per conversation with Matt, phone number ###-####, will reschedule for another date.
FIR15-00552 INSP-Supply line flush1/21/20161/22/20161/22/2016 12:50:15 PMACANC
Supply line flush cancelled per conversation with Matt, phone number ###-####, will reschedule for another date.
BLD15-04290 FIRE-Final Inspection1/21/20161/22/20161/22/2016 10:38:32 AMAFAIL
Exit sign located towards back area of tenant space (South side exit) needs to be serviced/replaced, exit sign/egress lights did no illuminate when test button was pushed. The same south exit door has thumbturn deadbolt installed, thumb turn deadbolt needs to be removed and single action door hardware needs to be installed. Tenant will reschedule life fire safey inspection afetr repairs are made.
FIR16-00006 INSP-Final Inspection1/22/20161/22/20161/22/2016 10:05:58 AMAPASS
Final fire sprinkler inspection passed/complete
FIR16-00006 INSP-Sprinkler Rough-in1/21/20161/22/20161/22/2016 10:03:47 AMAPASS
Rough to cover inspection complete, approved for cover.
FIR15-00885 INSP-Sprinkler Rough-in1/21/20161/22/20161/22/2016 8:50:34 AMAPASS
Project being worked in phases, rough to cover inspection complete for part of first floor, notated the city approved drawings with red ink area's approved for cover.
FIR16-00031 INSP-Sprinkler Rough-in1/21/20161/22/20161/21/2016 2:34:09 PMAPART
Rough to cover inspection for underground piping that is installed, piping that was inspected today approved for cover, contractor will schedule next inspection when they get the water supply to site and able to make the connection.