BLD17-01950
| BLD-Framing/Rough-in | 1/22/2018 | 1/22/2018 | 1/22/2018 4:07:03 PM | P | PART |
|
|
Ken Phone #: ###-#### west and north exterior walls ok //center 2hr framing wip
|
BLD17-01732
| BLD-Final | 1/19/2018 | 1/22/2018 | 1/22/2018 3:07:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD17-01732
| DOC - Permit Finaled | 1/22/2018 | 1/22/2018 | 1/22/2018 3:06:56 PM | P | PASS |
|
|
|
BLD17-04338
| BLD-Framing/Rough-in | 1/22/2018 | 1/22/2018 | 1/22/2018 2:47:37 PM | P | PART |
|
|
When you get to the site ask for Matt at the front desk and he will direct you to the area that needs to be inspected. If Possible please call me about an hour before you are going to be on site and I will try to get there to meet you for the inspection. ###-#### Phone #: ###-#### Inspection requested via web by Troy Ballard// interior walls ok to cover/ pending perlins for roof and backing for bathroom.//ok to drywall.
|
BLD17-04497
| BLD-Final | 1/22/2018 | 1/22/2018 | 1/22/2018 1:49:59 PM | P | PART |
|
|
Troy Phone #: ###-#### wip ok
|
BLD17-02243
| BLD-Framing/Rough-in | 1/19/2018 | 1/22/2018 | 1/22/2018 1:10:12 PM | A | PASS |
|
|
Nate Phone #: ###-####
|
BLD18-00004
| BLD-Final | 1/19/2018 | 1/22/2018 | 1/22/2018 10:37:06 AM | A | FAIL |
|
|
Any time inspection. Phone #: ###-#### Inspection requested via web by David Dexter need a-34 instaled tail to sub faicia per engineering
|
BLD17-00886
| BLD-Wall Bracing | 1/19/2018 | 1/22/2018 | 1/22/2018 9:54:48 AM | A | PASS |
|
|
DOug Phone #: ###-####
|
BLD17-04141
| BLD-Final | 1/19/2018 | 1/22/2018 | 1/22/2018 9:25:42 AM | A | PASS |
|
|
John Phone #: ###-####
|
BLD17-04141
| DOC - Permit Finaled | 1/22/2018 | 1/22/2018 | 1/22/2018 9:25:28 AM | P | PASS |
|
|
|
BLD17-03170
| BLD-Foundation | 1/22/2018 | 1/22/2018 | 1/22/2018 9:20:11 AM | A | DONE |
|
|
mike by 316
|