Inspections for the day of: Wednesday, January 22, 2020.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00527 BLD-Framing/Rough-in1/22/20201/22/20201/23/2020 6:56:16 AMPCANC
3rd floor inspection of trusses/hardware to start the process of inspections for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD19-04686 BLD-Framing/Rough-in1/17/20201/22/20201/22/2020 3:50:20 PMACANC
Please call Mierins (###-####) before you head out to the inspection so we can coordinate. Thank you Phone #: ###-#### Inspection requested via web by BRS Permitting//framing is not required as no work will be completed to the existing structure//
BLD18-02473 BLD-Final1/22/20201/22/20201/22/2020 3:22:02 PMPPASS
call ahead -Sherry Phone #: ###-####//no inspection card to sign//final complete per scope of work//door hardware changed//
BLD17-03056 BLD-Final1/22/20201/22/20201/22/2020 3:20:33 PMPPASS
Sherry Phone #: ###-####//no inspection card to sign//final complete per scope of work for infill and wall//door hardware was changed//
BLD19-04388 BLD-Final1/22/20201/22/20201/22/2020 12:54:07 PMPPASS
Robert Phone #: ###-####
BLD19-04388 DOC - Permit Finaled1/22/20201/22/20201/22/2020 12:53:55 PMPPASS
BLD20-00098 BLD-Foundation1/21/20201/22/20201/22/2020 11:06:44 AMAPART
Mark- Pour time 11am STEM WALL Phone #: ###-####//WIP//discussed with contractor about cold weather protection//cold weather protection will need to be provided//
BLD19-02291 BLD-Final1/21/20201/22/20201/22/2020 10:23:50 AMAPASS
Chris Phone #: ###-####//corrections made//
BLD19-02291 DOC - Permit Finaled1/22/20201/22/20201/22/2020 10:23:32 AMPPASS
BLD19-04385 BLD-Foundation1/22/20201/22/20201/22/2020 9:22:54 AMADEFR
setbacks were not re-verified prior to pouring vertical walls as noted on footing inspection//foundation wall inspection was not completed//contractor assumes all liability for setbacks and foundation//
BLD19-04385 BLD-Wall Bracing1/22/20201/22/20201/22/2020 9:20:48 AMAFAIL
need approved plans//add hot dipped galvanized nails at PT sill//
BLD19-04385 BLD-Framing/Rough-in1/21/20201/22/20201/22/2020 9:20:11 AMACANC
Phone #: ###-#### Inspection requested via web by John Treat//needed wall bracing//
MIS19-00076 MIS-Aging Inspection1/22/20201/22/20201/22/2020 8:53:18 AM CANC