Inspections for the day of: Friday, January 23, 1998.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD97-00698 INSP-Sprinkler Rough-in/Hydro1/23/19981/23/19981/23/1998 12:00:00 AMAPASS
rough-in okay. hydro okay. water temp of circulating system between 100-110.
BLD97-01426 INSP-Final Inspection1/22/19981/23/19981/23/1998 12:00:00 AMAFAIL
trip test of dry sprinkler system - okay. sprinkler system now has over 100 heads, not monitored. no outside control valve.
BLD97-01426 INSP-Sprinkler Rough-in/Hydro1/22/19981/23/19981/23/1998 12:00:00 AMPPASS
hydro passed.
BLD97-01243 INSP-Sprinkler Rough-in/Hydro1/22/19981/23/19981/23/1998 12:00:00 AMPPASS
PROBLEM CALL SHELLIE AT ###-#### time changed to 1:00 pm per inspector and contractor request basement rough-in only. okay to cover. additional head needed in southwest room to cover area missed by sidewall.
BLD97-00698 INSP-Sprinkler Rough-in/Hydro1/23/19981/23/19981/23/1998 12:00:00 AMPPASS
hydro of dry standpipe system - had to repair leak at basement - okay after repair.