Inspections for the day of: Wednesday, January 23, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00157 Final1/22/20021/23/20021/23/2002 12:00:00 AMAPASS
Scheduled by Inspector: 330 On 1/22/2002 1:45:35 PM routing of potable water loop is different than plans but to oowners sepcs. final ok 1/23/2002 10:01:39 AM
PLM01-03788 Final1/22/20021/23/20021/23/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/22/2002 at 14:27:06. Contact: ###-####.
PLM02-00160 Plumbing Rough-in1/22/20021/23/20021/23/2002 12:00:00 AMAFAIL
###-#### PLEASE CALL BEFORE GOING OUT fix leak on 2" existing waste by crawlspace, 17 fu max on 3/4" water, remove water heater flex from water heater t&p drain, luke needs a city license 1/23/2002 10:55:23 AM
PLM01-03984 Final1/22/20021/23/20021/23/2002 12:00:00 AMANR
first 20rms\\###-#### John
PLM01-03984 Final1/22/20021/23/20021/23/2002 12:00:00 AMPNR
first 20rms\\###-#### John
PLM02-00098 Other1/23/20021/23/20021/23/2002 12:00:00 AMPPART
###-#### just talked to owner about cross connection requirements, the heating loop in the floor is already set up for a mech inspection this afternoon 1/23/2002 2:13:40 PM
PLM02-00166 Plumbing Rough-in1/23/20021/23/20021/23/2002 12:00:00 AMPPART
###-#### gw and waste and vent system water in walls 1/23/2002 4:50:33 PM
PLM01-00177 Final1/23/20021/23/20021/23/2002 12:00:00 AMPPASS
NEEDS FINAL FOR CO ###-#### JOE TARAS
PLM02-00169 Water and/or Sewer1/23/20021/23/20021/23/2002 12:00:00 AMPNR
###-#### pipings done but the test wont be ready till mornin 1/23/2002 5:03:33 PM