FIR01-00396
| INSP-Sprinkler Rough-in/Hydro | 1/22/2002 | 1/23/2002 | 1/23/2002 12:00:00 AM | P | FAIL |
|
|
Attic dry system hydro failed 1/23/2002 3:33:31 PM
|
BLD00-03353
| FIRE-Final Inspection | 1/23/2002 | 1/23/2002 | 1/23/2002 12:00:00 AM | P | PART |
|
|
Items on the correction notice have been complete for the life safety inspection. Still need to final the fire alarm system before signing off on life safety per Sam Rogers 1/23/2002 1:39:58 PM
|
FIR01-00522
| INSP-Sprinkler Rough-in/Hydro | 1/23/2002 | 1/23/2002 | 1/23/2002 12:00:00 AM | P | PASS |
|
|
hydro test for the 2nd floor T.I. is OK 1/23/2002 4:45:30 PM
|
FIR01-00396
| INSP-Sprinkler Rough-in/Hydro | 1/23/2002 | 1/23/2002 | 1/23/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 430 On 1/23/2002 3:36:00 PM Rough-in OK for the attic system. Contractor to relocate two upright sprinkler heads at east end. Left notice with General Contractor that draft stops and sheer walls need to be installed to separate sprinkler heads that are too close down mechanical corridor
|