PLM04-00115
| Plumbing Rough-in | 1/22/2004 | 1/23/2004 | 1/23/2004 12:00:00 AM | A | FAIL |
|
|
DAREN ###-#### 2" min. sink waste, max 1 1/2" WASTE ARM IS 42", c.o. reouired on waste lines over 5', pipe pan and relief lines, roll poly clamps 180 deg. 1/23/2004 9:54:25 AM
|
PLM03-03536
| Final | 1/22/2004 | 1/23/2004 | 1/23/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/22/2004 at 12:45:55 PM. Contact: ###-####. final ok 1/23/2004 10:19:53 AM
|
PLM03-03748
| Final | 1/22/2004 | 1/23/2004 | 1/23/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/22/2004 at 12:48:41 PM. Contact: ###-####. ri was done on plm03-03783 no water softenor roughed in prior to 12/01/03 just wasnt called in due to a mix up of some kind. final ok 1/23/2004 10:20:07 AM
|
PLM03-03288
| Final | 1/22/2004 | 1/23/2004 | 1/23/2004 12:00:00 AM | A | PART |
|
|
roger ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie temp occ ok calk fixtures, set class sink, test dcva 1/23/2004 9:12:27 AM
|
PLM04-00082
| Plumbing Rough-in | 1/22/2004 | 1/23/2004 | 1/23/2004 12:00:00 AM | A | NR |
|
|
|
PLM04-00084
| Plumbing Rough-in | 1/22/2004 | 1/23/2004 | 1/23/2004 12:00:00 AM | A | PASS |
|
|
ri ok 1/23/2004 1:49:01 PM
|
PLM04-00152
| Plumbing Rough-in | 1/22/2004 | 1/23/2004 | 1/23/2004 12:00:00 AM | A | PASS |
|
|
###-#### Paul fial ok 1/23/2004 10:29:44 AM
|
PLM04-00150
| Final | 1/22/2004 | 1/23/2004 | 1/23/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/22/2004 at 4:47:21 PM. Contact: ###-####. sewer final ok 1/23/2004 10:52:23 AM
|
PLM04-00144
| Plumbing Rough-in | 1/23/2004 | 1/23/2004 | 1/23/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 1/23/2004 at 10:34:52 AM. Contact: ###-####. leaky 1/26/2004 9:20:44 AM
|
PLM03-01954
| Final | 1/23/2004 | 1/23/2004 | 1/23/2004 12:00:00 AM | P | PASS |
|
|
carlo ###-#### re-insp final ok 1/23/2004 2:14:00 PM
|