ESC05-00220
| Site Preparation | 1/23/2006 | 1/23/2006 | 1/23/2006 2:44:53 PM | P | PART |
|
|
Overall things look good; minor dirt track-out onto hard surfaces.
|
ESC04-00912
| Tracking Control | 1/23/2006 | 1/23/2006 | 1/23/2006 12:00:00 AM | P | FAIL |
|
|
Verbal to RP--Sub-contractor disturbed existing cons. entrance, backfilled and now entrance is in need of rebuilding per industry standards an acceptable stone entrance to reduce mud/dirt from being tracked out. RP sail it will be done. Will follow up.
|