Inspections for the day of: Wednesday, January 23, 2008.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-01962 BLD-Conference1/23/20081/23/20081/23/2008 3:20:50 PMPPASS
I have a question about protection post locations. Phone #: ###-#### Internet Inspection Request from: Joshua Legg
BLD07-01959 BLD-Conference1/23/20081/23/20081/23/2008 3:20:30 PMPPASS
I have a question about protection post locations. Phone #: ###-#### Internet Inspection Request from: Joshua Legg
BLD07-01958 BLD-Conference1/23/20081/23/20081/23/2008 3:20:05 PMPPASS
I have questions about protection posts in the garage and glass in shower. Phone #: ###-#### Internet Inspection Request from: Joshua Legg
BLD06-01450 BLD-Conference1/23/20081/23/20081/23/2008 2:28:49 PMPDONE
Dave; I have a couple quick questions on
framing I need to run by you. Could
we meet at job trailer some time
today? Bob Phone #: ###-####
Internet Inspection Request from: bob austin
Architect to provide new wall details for approval.......or Call Dave
BLD07-02605 BLD-Aging Inspection1/23/20081/23/20081/23/2008 11:14:07 AM PASS
work has not started yet.
BLD07-00339 BLD-Aging Inspection1/23/20081/23/20081/23/2008 11:12:51 AM DONE
doc expired
BLD07-00339 DOC - Permit Expired1/23/20081/23/20081/23/2008 11:12:25 AMPPASS
no requise for insp. no contact from engineer as to the field final review to design. doc expired
BLD06-01235 BLD-Aging Inspection1/23/20081/23/20081/23/2008 11:05:05 AM DEFR
pending fire action.
BLD07-02132 BLD-Final1/22/20081/23/20081/23/2008 10:52:42 AMAPASS
###-#### - mike
BLD07-02703 BLD-Final1/22/20081/23/20081/23/2008 10:52:27 AMAPASS
joeorning Phone #: ###-####
BLD07-03266 BLD-Energy code compliance1/22/20081/23/20081/23/2008 10:38:03 AMAPASS
bruce - insulation Phone #: ###-####
BLD07-03266 BLD-Framing/Rough-in1/23/20081/23/20081/23/2008 10:37:47 AMPPASS
BLD07-02765 BLD-Conference1/22/20081/23/20081/23/2008 10:24:10 AMAPASS
Scheduled by a contractor via Hello! on 1/22/2008 at 1:31:21 PM. Contact: ###-####.
BLD07-02766 BLD-Conference1/22/20081/23/20081/23/2008 10:23:55 AMAPASS
Scheduled by a contractor via Hello! on 1/22/2008 at 1:32:24 PM. Contact: ###-####.
BLD07-02768 BLD-Conference1/22/20081/23/20081/23/2008 10:23:33 AMAPASS
Scheduled by a contractor via Hello! on 1/22/2008 at 1:33:30 PM. Contact: ###-####.
BLD07-02505 BLD-Final1/22/20081/23/20081/23/2008 10:16:08 AMADEFR
cecil Phone #: ###-#### need plm final
BLD07-02392 BLD-Final1/22/20081/23/20081/23/2008 10:01:15 AMAPASS
hollis Phone #: ###-#### deck to be re permited not done with this scope of work.
BLD07-02392 DOC - Permit Finaled1/23/20081/23/20081/23/2008 10:00:08 AMPPASS
BLD07-01250 BLD-Final1/22/20081/23/20081/23/2008 9:55:20 AMPCANC
scott Phone #: ###-#### Note: please 1/2 hr prior to inspection Inspection cancelled from web by: Patricia Smith
BLD07-02625 BLD-Framing/Rough-in1/22/20081/23/20081/23/2008 9:23:39 AMAFAIL
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger front attic can not verify 1 hr wall thru space per plan/ justify bearing blk as built by engineering. ok to insulate.
MIS08-00008 MEC-Conference1/18/20081/23/20081/23/2008 12:00:00 AMACANC
meet joe at 9:00am