Inspections for the day of: Friday, January 23, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-01005 INSP-Final Inspection1/22/20091/23/20091/26/2009 3:22:34 PMPPART
Hydrostatic testing for each system at all four building risers completed satisfactory, final walkthrough also completed for head change-out. Discovered 5 remaining heads to be changed at the mens locker room area 1st floor, missing ceiling tiles at the offices behind the front reception counter, and two missing escutcheons (installed while on site). NOTE: Site inspection completed on Sat. 1/24/09 per request.
BLD09-00046 FIRE-Final Inspection1/23/20091/23/20091/23/2009 4:32:45 PMPFAIL
Need to remove surface mounted deadbolts at both warehouse exit doors, remove the manual thumbturn at the main entry/exit door.
FIR05-00130 INSP-Final Inspection1/23/20091/23/20091/23/2009 4:28:59 PMPPASS
Fire alarm permit finaled.
FIR05-00503 INSP-Final Inspection1/23/20091/23/20091/23/2009 4:28:30 PMPPASS
Fire alarm permit finaled.
FIR08-00345 INSP-Conference1/21/20091/23/20091/23/2009 4:27:36 PMADONE
Permit work to be scheduled for site testing per discussion.
FIR05-00421 INSP-Conference1/21/20091/23/20091/23/2009 4:25:53 PMADONE
Fire alarm work to be scheduled for site testing as agreed.
FIR05-00130 INSP-Conference1/21/20091/23/20091/23/2009 4:24:29 PMADONE
Okay for final
FIR05-00503 INSP-Conference1/21/20091/23/20091/23/2009 4:23:16 PMAPASS
FA permit work finaled.
FIR07-00677 INSP-Conference1/21/20091/23/20091/23/2009 4:22:25 PMADONE
Relocated H/S to be tested as discussed in tandem with FIR permits 421 and 345.
BLD08-02450 FIRE-Final Inspection1/23/20091/23/20091/23/2009 4:14:33 PMPPASS
jason Phone #: ###-####
FIR09-00020 INSP-Final Inspection1/23/20091/23/20091/23/2009 4:13:57 PMPNR
chris Phone #: ###-#### Note: please if possible after 2:00
FIR08-00669 INSP-Final Inspection1/22/20091/23/20091/23/2009 4:13:02 PMAPASS
Noted correction items verified for compliance, final fire alarm testing passed, permit finaled.
FIR08-00461 INSP-Sprinkler Rough-in/Hydro1/22/20091/23/20091/23/2009 4:11:07 PMAPART
6th floor common corridor overhead install okayed for cover.
BLD08-02387 FIRE-Final Inspection1/22/20091/23/20091/23/2009 11:01:08 AMAPASS
C/N items finished, fire life safety passed.
FIR08-00669 INSP-Final Inspection1/21/20091/23/20091/22/2009 4:36:02 PMACANC
Dannie Jackson @ 6 AM Phone #: ###-#### Internet Inspection Request from: Diane Turner Inspection cancelled from web by: Diane Turner