MEC09-00105
| Rough-in | 1/23/2009 | 1/23/2009 | 1/23/2009 1:53:45 PM | P | PASS |
|
|
|
MEC09-00119
| Rough-in | 1/23/2009 | 1/23/2009 | 1/23/2009 1:12:04 PM | P | PASS |
|
|
Please do rough in and final reinspection for furnace change out. The condensate is going outside right next to the a/c line. Electricians are done. Please call for access if needed. Thank you. Phone #: ###-#### Internet Inspection Request from: Donnette Ellis
|
MEC09-00107
| Final | 1/22/2009 | 1/23/2009 | 1/23/2009 12:59:48 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/22/2009 at 4:37:43 PM. Contact: ###-####.
|
MEC08-01072
| Rough-in | 1/22/2009 | 1/23/2009 | 1/23/2009 11:58:53 AM | A | PASS |
|
|
PLEASE CALL RON BOLEN Phone #: ###-#### Internet Inspection Request from: AMANDA FARNSWORTH ok to insulate grease duct and ducts at the band and choir room
|
MEC08-01624
| Final | 1/22/2009 | 1/23/2009 | 1/23/2009 11:10:54 AM | A | PART |
|
|
Willie Ranson they are ready for a final to cover. 7th floor, Thank you. Phone #: ###-#### Internet Inspection Request from: Mary Treese 7th floor ok for hvac, still need correct condensate connection for drain
|