Inspections for the day of: Friday, January 23, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-00025 Site Final1/23/20091/23/20091/23/2009 3:51:34 PMPPASS
ESC08-00183 Random Inspection1/23/20091/23/20091/23/2009 3:47:07 PMPPASS
ESC08-00706 Tracking Control1/21/20091/23/20091/23/2009 3:45:31 PMPPART
Need to keep up on sweeping if and sediment imgrates within the street and or gutterpan of the project.
ESC08-00725 BMP Violation1/21/20091/23/20091/23/2009 1:47:01 PMAPASS
ESC08-00953 BMP Violation1/21/20091/23/20091/23/2009 10:39:54 AMAPASS
ESC08-01016 BMP Violation1/21/20091/23/20091/23/2009 10:39:30 AMAPASS
ESC08-00924 Random Inspection1/23/20091/23/20091/23/2009 10:15:41 AMAPASS
All pumps are off. NO discharging of any water ttype into basin or Wallings Creek.
ESC07-00904 Random Inspection1/23/20091/23/20091/23/2009 9:26:22 AMAPASS
ESC08-00790 General Inspection1/20/20091/23/20091/23/2009 9:10:58 AMPPART
Due to snow was not able to see the valley gutter.
ESC08-00789 General Inspection1/20/20091/23/20091/23/2009 9:10:45 AMPPART
Due to snow was not able to see the valley gutter.
ESC08-00788 General Inspection1/20/20091/23/20091/23/2009 9:10:29 AMPPART
Due to snow was not able to see the valley gutter.
ESC08-00737 BMP Violation1/20/20091/23/20091/23/2009 9:09:40 AMPFAIL
Moved to 1/26/09 due to the freeze.
ESC08-00814 BMP Violation1/20/20091/23/20091/23/2009 9:08:19 AMAPART
RP to remain the same. All issues seem to be corrected.