PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, January 23, 2012
.
Number of inspections:
11
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC10-00778
General Inspection
1/23/2012
1/23/2012
1/23/2012 4:12:27 PM
FAIL
Verbal to RP:
Install additional sediment protection along the bottom of the top soil stockpile on the canal side. Maintain the perimeter sediment barriers along the Boise River side of the project. There are two areas where the sediment barrier is either being consumed by the stockpile and another part where there is a gap between the wattles. Will follow up on 1/27/2011 am.
ESC11-00816
General Inspection
1/20/2012
1/23/2012
1/23/2012 2:06:19 PM
A
CANC
ESC11-00681
BMP Violation
1/20/2012
1/23/2012
1/23/2012 2:06:08 PM
A
PART
Contractor install perventitive measures. And cleanedup all of the sediment and debris from the hard surfaces.
ESC11-00709
General Inspection
1/20/2012
1/23/2012
1/23/2012 10:41:40 AM
A
PASS
ESC11-00055
General Inspection
1/23/2012
1/23/2012
1/23/2012 10:41:34 AM
PASS
Waiting on stabiliztionto acheive
ESC09-00352
BMP Violation
1/20/2012
1/23/2012
1/23/2012 10:41:10 AM
A
PART
Will have the rock check dam back inplace by 1/24/2012
ESC11-00884
General Inspection
1/23/2012
1/23/2012
1/23/2012 9:58:26 AM
PASS
ESC11-00009
General Inspection
1/23/2012
1/23/2012
1/23/2012 9:51:14 AM
PASS
ESC11-00415
BMP Violation
1/20/2012
1/23/2012
1/23/2012 9:48:33 AM
A
FAIL
Final Notice:
CLean up all mortar residual surrounding the batch mixers and the washout the containerize or remove from the project. When equipment can access the back section of the project, They must relocate the batch mixers into a contained area that is lined with a 10mil or greater plastic. Also no more vehicle access is allowed to the back portion of the project area until the time being that a stabilized construction exit is install per industry standards.
Will re-inspect on 1/24/2012 am for attempts to achieve compliance.
ESC10-00918
General Inspection
1/23/2012
1/23/2012
1/23/2012 8:28:40 AM
PASS
ESC09-00507
General Inspection
1/23/2012
1/23/2012
1/23/2012 8:18:22 AM
PASS