FIR13-00728
| INSP-Sprinkler Rough-in | 1/23/2014 | 1/23/2014 | 1/23/2014 1:41:33 PM | P | PASS |
|
|
|
BLD13-00682
| FIRE-Final Inspection | 1/23/2014 | 1/23/2014 | 1/23/2014 1:40:49 PM | P | PASS |
|
|
F&LS Pass
|
FIR14-00028
| INSP-Final Inspection | 1/22/2014 | 1/23/2014 | 1/23/2014 1:39:52 PM | P | PASS |
|
|
pass
|
FIR13-00678
| INSP-Final Inspection | 1/22/2014 | 1/23/2014 | 1/23/2014 10:14:45 AM | A | CANC |
|
|
no return call. contractor on site says no inspections requested.
|
FIR14-00025
| INSP-Final Inspection | 1/21/2014 | 1/23/2014 | 1/23/2014 9:30:08 AM | A | PASS |
|
|
|
FIR13-00692
| INSP-Sprinkler Rough-in | 1/22/2014 | 1/23/2014 | 1/23/2014 9:29:36 AM | A | FAIL |
|
|
insulation obstructing heads. Need to check coverage on other side of wall in nail salon
|