Inspections for the day of: Friday, January 23, 2015.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRex Boyles
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE12-02081 ELE-Aging Inspection1/23/20151/23/20151/26/2015 3:31:06 PM DONE
phone disconnected
ELE13-00565 ELE-Aging Inspection1/23/20151/23/20151/23/2015 3:36:01 PM DONE
left message
ELE12-01528 ELE-Aging Inspection1/23/20151/23/20151/23/2015 3:31:38 PM DONE
phone disconnected
ELE10-02067 ELE-Aging Inspection1/23/20151/23/20151/23/2015 3:29:15 PM DONE
left message
ELE15-00055 Electrical Rough-In1/23/20151/23/20151/23/2015 3:19:53 PMPPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i under slab conduits ok to cover
ELE15-00177 Final1/23/20151/23/20151/23/2015 2:54:18 PMPPASS
Boise Project Board of Controls. Add circuit for UPS system. They close at 4:30 on Fridays. Thank you Phone #: ###-#### Inspection requested via web by Randy Fletcher final ok
ELE15-00182 Permanent Service1/23/20151/23/20151/23/2015 2:39:49 PMPPASS
Mike is the contact his cell no. is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates p/s o/h rec ok replace weather head and service entrance conductors damaged by tree ( will look for grounding electrode at final)
ELE14-01683 Final1/23/20151/23/20151/23/2015 2:14:44 PMPPASS
###-####-Larry-please call 45 minutes prior for access final ok
ELE15-00174 Electrical Rough-In1/23/20151/23/20151/23/2015 1:20:13 PMPPASS
Exterior // Joel ###-#### r/i ok exterior walls and walls clouded on plans
ELE14-03181 Final1/23/20151/23/20151/23/2015 12:31:05 PMPFAIL
Garage code 1979E Phone #: ###-#### Inspection requested via web by Alan Lusk 210.12(A)(1)-AFCI protection required in dnst. bedroom.
ELE14-03316 Electrical Rough-In1/22/20151/23/20151/23/2015 10:05:30 AMAPASS
Contact Tom Hartung for underground raceways. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok underground for 12.5KVA to transformer pads 3&4 . Also Core wall receptacle and 2 lights north side r/i ok
ELE14-01611 Electrical Rough-In1/22/20151/23/20151/23/2015 9:19:09 AMAPASS
call for access
bathroom and living room are finally finished ready for rough in inspection Phone #: ###-#### Inspection requested via web by danny perrine r/i ok
ELE14-02600 Final1/22/20151/23/20151/23/2015 8:42:22 AMAPASS
Phone #: ###-#### Inspection requested via web by Neal Rumsey final ok
ELE15-00172 Electrical Rough-In1/22/20151/23/20151/23/2015 8:17:09 AMAPASS
wall cover Phone #: ###-#### Inspection requested via web by Karl Paige (on Northrup behind City of Boise bldg) r/i wall ok
ELE15-02132 Conference1/22/20151/23/20151/23/2015 12:00:00 AMADONE
Discuss waterproofing of 4th level in order to expedite wiring rough in on levels 2 and 3. Phone #: ###-#### Inspection requested via web by Rafael Castillo ok to install nm cable in areas that are going to be waterproofed by McAlvain