FIR14-00330
| INSP-Conference | 1/22/2015 | 1/23/2015 | 1/23/2015 4:04:03 PM | P | DONE |
|
|
On site visit with contractor regarding SA locations at living units- discussed min. distances from HVAC registers, ceiling fans, bathroom doors, cooking appliances, walls, etc. Also noted missing visual notification at ADA unit guest bathrooms and obstructed coverage at units provided with a divided vanity adjacent to the bedroom.
|
FIR14-00783
| INSP-Sprinkler Rough-in | 1/22/2015 | 1/23/2015 | 1/23/2015 3:58:53 PM | A | PART |
|
|
Inspection for hanger attatchments at the riser room prior to vapor cover.
|
FIR14-00889
| INSP-Sprinkler Rough-in/Hydro | 1/22/2015 | 1/23/2015 | 1/23/2015 3:57:17 PM | A | PART |
|
|
Hydrostatic testing of the new dry system piping passed. Also verified completion of previous C/N items including added coverage at the vestibule, flex couplings at the main, adjusted spacing, outside WF bell installed.
|
BLD13-03418
| FIRE-Final Inspection | 1/21/2015 | 1/23/2015 | 1/23/2015 11:53:02 AM | A | PART |
|
|
Completed fire life safety walkthrough of the HR dept. remodel area first floor- 6th street exit access and egress path to be maintained available as discussed.
|
FIR14-00889
| INSP-Sprinkler Rough-in | 1/22/2015 | 1/23/2015 | 1/23/2015 11:48:06 AM | A | PART |
|
|
Completed satisfactory hydrostatic test of the new dry system.
|
FIR14-00243
| INSP-Alarm Testing | 1/21/2015 | 1/23/2015 | 1/23/2015 11:46:08 AM | A | PART |
|
|
Completed functional testing of notification appliances at the remodel area phase one first floor HR dept. only.
|