ELE17-00160
| Permanent Service | 1/23/2017 | 1/23/2017 | 1/23/2017 2:04:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Contractor not sure if remodel work needed. Will check after house clean up complete. p/s o/h rec ok
|
ELE17-00156
| Conference | 1/23/2017 | 1/23/2017 | 1/23/2017 1:55:03 PM | P | DONE |
|
|
Please contact Todd Sellman to meet onsite for conference. ###-####. Phone #: ###-#### Inspection requested via web by Todd Sellman Contactor to add new 480 volt service to building. CT meter at outdoor transformer. Main disconnecting means outside on south side. Once on inside plans are to install a gutter to tap off and refeed existing disconnects. Issues BCC 4-05-32- Code violations not to be retained. 110.26(A)- Minimum work space shall be provided for all disconnecting means. 36" deep and 30" wide. 110.26(B)- Work space shall be clear of foriegn equipment, compressor encroaches on space. 404.8(A)- Max height of disconnecting means shall not exceed 6'7".
|
ELE16-03550
| Final | 1/23/2017 | 1/23/2017 | 1/23/2017 12:51:53 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Noeker Final ok
|
ELE15-01348
| Final | 1/20/2017 | 1/23/2017 | 1/23/2017 10:46:07 AM | A | PART |
|
|
Please call Tom Hartung for TCO inspection of levels 7,8,9 of the office building. Phone #: ###-#### Inspection requested via web by Tom Betty Level 7 board room 749-2 circuit 72-B to be locked off until table is installed. MC thru floor can not be romoved without removing drywall. All levels furniture covers some are loose on line volt and low volt sides. Some card reader low volt boxes open. Shunt trip locations not changed as per State inspectors request, general contractor hoping for variance. Signed TCO on HQ.
|
ELE16-01838
| Final | 1/20/2017 | 1/23/2017 | 1/23/2017 10:45:35 AM | A | PART |
|
|
Please call Tom Hartung for TCO inspection on levels 7,8,9 of the office building. Phone #: ###-#### Inspection requested via web by Tom Betty Level 7 board room 749-2 circuit 72-B to be locked off until table is installed. MC thru floor can not be romoved without removing drywall. All levels furniture covers some are loose on line volt and low volt sides. Some card reader low volt boxes open. Shunt trip locations not changed as per State inspectors request, general contractor hoping for variance. Signed TCO on HQ.
|