Inspections for the day of: Tuesday, January 23, 2018.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00022 ELE-Conference1/23/20181/23/20181/23/2018 3:22:31 PMPDONE
please homeowners call when on way Phone #: ###-####....work done wiring a new sun room with no electrical permit...discussed with homeowner the requirement for the wiring but also explained that the contractor did not pull a permit...homeowners had the business card of the electrician that did the work...i took a picture of said business card and sent it to Daryl Degrange to get a hold of electrical contractor...work that was done is to code...future inspection scheduled to follow up unless a permit is pulled and inspections scheduled for that permit
ELE13-00855 ELE-Aging Inspection1/23/20181/23/20181/23/2018 2:34:50 PM DONE
Waiting for contractor to call for final
ELE17-01537 Electrical Rough-In1/23/20181/23/20181/23/2018 2:12:14 PMPPASS
Inspect grid ceilings for cover Phone #: ###-#### Inspection requested via web by Jeremy Cloud..
ok to cover...complete grid
ELE17-01536 Electrical Rough-In1/23/20181/23/20181/23/2018 2:11:16 PMPPASS
Inspect IT room ceiling for cover Phone #: ###-#### Inspection requested via web by Jeremy Cloud...ok to cover...grid complete
ELE13-02178 Final1/22/20181/23/20181/23/2018 1:44:39 PMPFAIL
Mitch Phone #: ###-####....no access...no one home...further inspections will require contractor be there to guarantee access
ELE18-00039 Final1/22/20181/23/20181/23/2018 1:26:42 PMPPASS
Tim Phone #: ###-####...ok to final
ELE18-00294 Temporary Service1/23/20181/23/20181/23/2018 11:42:23 AMPPASS
Phone #: ###-#### Inspection requested via web by Bob Glenn...t/s u/g new ok
ELE18-00293 Temporary Service1/23/20181/23/20181/23/2018 11:41:59 AMPPASS
Phone #: ###-#### Inspection requested via web by Bob Glenn...t/s u/g new ok
ELE17-04325 Final1/23/20181/23/20181/23/2018 11:19:50 AMPCANC
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have questions. Thank you. Inspection requested via web by Rob Maes...
job not complete...no panels
ELE18-00256 Rough-In Permanent Service1/23/20181/23/20181/23/2018 11:13:45 AMAPASS
Neil is electrician on site Phone #: ###-#### Inspection requested via web by Matthew White...

p/s o/h reconnect ok
ELE18-00282 Electrical Rough-In1/22/20181/23/20181/23/2018 10:50:26 AMAPASS
Rough in ready for inspection for kitchen remodel.
For questions please call Todd@ ###-####
Home owner# ###-####
Phone #: ###-#### Inspection requested via web by Kendra Lanham...rough ok to cover...new kitchen, circuit added for micro and gfi kitchen counter, new lighting
ELE18-00089 Electrical Rough-In1/22/20181/23/20181/23/2018 10:28:50 AMAPASS
call on way to meet (5 min. away) // Rhett Phone #: ###-####....rough in ok to cover...pics of removal of wire bundling in attic and ground crimps/wire nut
ELE18-00089 Conference1/23/20181/23/20181/23/2018 10:27:30 AMPPASS
call on way to meet (5 min. away) // Rhett Phone #: ###-####...homeowner very knowledgeable in wiring, discussed wiring methods, grounding, sub panel ground neutral seperation, tamper resistant outlets...pamphlet given
ELE17-03922 Final1/22/20181/23/20181/23/2018 9:44:23 AMAFAIL
Phone #: ###-#### Inspection requested via web by kendall bender...

1) RTU units need labelled
2) service outlets need verified
3) water heater needs installed and wiring completed
4) wall nat top of stairs to offices needs completed...wiring in wall
5) miscellaneus plates removed inside main tenant space
ELE17-02577 Final1/22/20181/23/20181/23/2018 9:41:49 AMAFAIL
Phone #: ###-#### Inspection requested via web by kendall bender..
1) panel key lock for panel LP

2) all temp power shall be removed out of panels

3) electrical room framing needs complete

4) doors to electrical room need installed and panic hardware installed

5) lighting in vanilla tenant space on core and shell permit need installed

6) access to church and youth ranch to inspect construction related to core and shell
7) fronts for egress lighting need built and wiring for lights need completed