BLD17-02413
| BLD-Footing | 1/23/2018 | 1/23/2018 | 1/23/2018 4:31:36 PM | P | PART |
|
|
Concrete is scheduled for 3pm Phone #: ###-#### Inspection requested via web by Marty Short. Footing not 10 inch depth. Contractor to repair.
|
BLD17-04377
| BLD-Footing | 1/22/2018 | 1/23/2018 | 1/23/2018 4:30:17 PM | P | CANC |
|
|
Dane Phone #: ###-####
|
BLD17-04492
| BLD-Foundation | 1/22/2018 | 1/23/2018 | 1/23/2018 4:30:16 PM | P | CANC |
|
|
Dane Phone #: ###-####
|
BLD17-03871
| BLD-Foundation | 1/22/2018 | 1/23/2018 | 1/23/2018 3:13:16 PM | P | NR |
|
|
Dane Phone #: ###-####. No one on site. No stemwall forms erected.
|
BLD17-04381
| BLD-Foundation | 1/22/2018 | 1/23/2018 | 1/23/2018 2:58:51 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD17-04387
| BLD-Foundation | 1/22/2018 | 1/23/2018 | 1/23/2018 2:54:00 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD17-04068
| BLD-Framing/Rough-in | 1/23/2018 | 1/23/2018 | 1/23/2018 2:50:55 PM | P | PASS |
|
|
Vicki Phone #: ###-####. INterior steel stud framed walls only ok. No grid.
|
BLD17-04485
| BLD-Final | 1/23/2018 | 1/23/2018 | 1/23/2018 2:17:39 PM | P | PASS |
|
|
Sid Phone #: ###-####. Ok for perm occ.
|
BLD17-00828
| BLD-Final | 1/23/2018 | 1/23/2018 | 1/23/2018 1:59:47 PM | P | FAIL |
|
|
please call before // Delbert Phone #: ###-####. Provide rated attic acces, remove the keyed hardware from the secondary door, lower breakroom cabinant and needs zoninf final.
|
BLD16-02749
| BLD-Wall Bracing | 1/23/2018 | 1/23/2018 | 1/23/2018 1:27:39 PM | P | PASS |
|
|
Inspection requested via web by Sam Brown
|
BLD16-02746
| BLD-Wall Bracing | 1/23/2018 | 1/23/2018 | 1/23/2018 1:27:23 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD17-02421
| BLD-Energy code compliance | 1/22/2018 | 1/23/2018 | 1/23/2018 11:43:10 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD18-00115
| BLD-Framing/Rough-in | 1/22/2018 | 1/23/2018 | 1/23/2018 9:46:46 AM | A | FAIL |
|
|
Antonio Phone #: ###-####. Remove screws from top track tto grid, and install the kickers as shown on the approved plans.
|
BLD17-02093
| BLD-Energy code compliance | 1/22/2018 | 1/23/2018 | 1/23/2018 9:15:46 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by keith bucher. All fraing issues not yet corrected.
|
BLD17-00644
| BLD-Ceiling Grid Inspection | 1/22/2018 | 1/23/2018 | 1/23/2018 8:51:45 AM | A | PASS |
|
|
12'' x 18'' storage room Phone #: ###-#### Inspection requested via web by Mark Steen
|
MIS17-00223
| DOC - Permit Finaled | 1/23/2018 | 1/23/2018 | 1/23/2018 8:07:10 AM | P | PASS |
|
|
This home was never moved from eagle. Lot owner had a new mobile home placed on a permanant foundation at this location.
|
MIS17-00025
| DOC - Permit Finaled | 1/23/2018 | 1/23/2018 | 1/23/2018 8:05:34 AM | P | PASS |
|
|
Per plumbing inspector in activities, Issue has been resolved.
|
BLD17-02093
| BLD-Energy code compliance | 1/22/2018 | 1/23/2018 | 1/22/2018 5:45:57 PM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by keith bucher Inspection cancelled from web by: keith bucher
|