BLD99-03310
| BLD-Foundation | 1/21/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 07:05:21. Contact: ###-####. Special inspectin on site. 1/25/00 1:31:01 PM
|
BLD99-02135
| BLD-Framing/Rough-in | 1/21/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 08:50:48. Contact: ###-####. No address #'s- no approved plan engineered fix covered w/siding (shear) truss engineering & TSI specs not done. 1/25/00 1:30:09 PM
|
BLD99-02135
| BLD-Wall cover | 1/21/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 08:51:50. Contact: ###-####. covered w/siding- remove for inspection. 1/25/00 1:30:26 PM
|
BLD99-02641
| BLD-Energy code compliance | 1/21/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | A | PASS |
|
|
jay ###-#### energy code
|
BLD99-03556
| BLD-Framing/Rough-in | 1/21/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 14:24:12. Contact: ###-####. Not to plan, over heigth wall, truss eng. not done. 1/25/00 1:30:47 PM
|
MEC00-00112
| Rough-in | 1/24/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/24/2000 at 08:50:50. Contact: ###-####. Calcs & gas pipe length not on site, per precious C/N from 411. 1/25/00 1:31:33 PM
|
MEC00-00112
| Pressure Test | 1/24/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/24/2000 at 08:51:19. Contact: ###-####. P/T failed. 1/25/00 1:31:40 PM
|