ELE00-00236
| Electrical Rough-In | 1/21/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | A | PART |
|
|
rob--###-#### Ele. R/I walls; redundant grounding required in exam rooms. 1/25/00 1:11:25 PM
|
ELE99-03227
| Final | 1/21/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 15:13:22. Contact: ###-####. Completed. 1/25/00 1:11:56 PM
|
ELE99-02692
| Final | 1/22/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/22/2000 at 11:55:28. Contact: ###-####. Area 'B' & 'E' temporary occupancy; 2nd floor. 1/25/00 1:11:47 PM
|
ELE00-00229
| Final | 1/24/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | A | PASS |
|
|
Fire-damage. Ok for service/meter reconnect for request for power.
|
ELE00-00245
| Electrical Rough-In | 1/24/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | P | PART |
|
|
###-#### Pool bonding. 1/25/00 1:25:05 PM
|
ELE99-04063
| Final | 1/24/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/24/2000 at 08:37:25. Contact: ###-####. Not ready; ground to ufer & bond to gas pipe not connected. contractor will reschedule. 1/25/00 1:26:10 PM
|
ELE99-04490
| Electrical Rough-In | 1/24/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | P | PASS |
|
|
###-#### Ele. R/I; perm/svc. 1/25/00 1:25:16 PM
|
ELE00-00106
| Temporary Service | 1/24/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | P | PASS |
|
|
###-#### Temp. pole 1/25/00 1:25:24 PM
|
ELE99-03160
| Electrical Rough-In | 1/24/2000 | 1/24/2000 | 1/24/2000 12:00:00 AM | P | PASS |
|
|
pole barn\###-#### Jim \\can you call 1/2 ahead of time Perm. svc.; Ele. R/I- garage. 1/25/00 1:25:43 PM
|