BLD00-03211
| FIRE-Final Inspection | 1/23/2001 | 1/24/2001 | 1/24/2001 12:00:00 AM | A | FAIL |
|
|
###-####. Final Fail C/N issued 1/24/2001 5:17:52 PM
|
BLD00-03232
| FIRE-Final Inspection | 1/23/2001 | 1/24/2001 | 1/24/2001 12:00:00 AM | A | FAIL |
|
|
###-#### ###-#### Final Fail Spklr plans 1/24/2001 1:23:04 PM
|
FIR01-00022
| INSP-Sprinkler Rough-in/Hydro | 1/23/2001 | 1/24/2001 | 1/24/2001 12:00:00 AM | A | PART |
|
|
###-#### OK on spklr rough in and above ground hydro test 1/24/2001 5:17:01 PM
|
BLD00-03231
| FIRE-Conference | 1/23/2001 | 1/24/2001 | 1/24/2001 12:00:00 AM | A | PART |
|
|
j c ###-#### fire conference Conf with JC on spklr monitoring 1/24/2001 1:23:53 PM
|
FIR01-00015
| INSP-Sprinkler Rough-in | 1/24/2001 | 1/24/2001 | 1/24/2001 12:00:00 AM | P | PART |
|
|
\###-#### OK to cover spklr supply line 1/24/2001 5:19:21 PM
|
FIR00-00628
| INSP-Sprinkler Rough-in | 1/23/2001 | 1/24/2001 | 1/24/2001 12:00:00 AM | P | PART |
|
|
###-#### OK on spklr rough in and above ground hydro test 1/24/2001 5:18:32 PM
|