Inspections for the day of: Thursday, January 24, 2002.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01744 FIRE-Final Inspection1/22/20021/24/20021/24/2002 12:00:00 AMAFAIL
provide fire extinguishers in the penthouse and basement electrical rooms, elevator recall does not work, a bush obstructs the FDC, paint curbing per sheet A1.0, provide no parking signs per note 13, provide secondary containment verification for the emergency generator, provide offsite monitoring of the fire sprinkler system, provide floor signage and use stairs signs at elevators per notes 28 and 29, install door at ground level south exit, provide door on 2nd floor electrical room, verify life/safety and fire alarm and fire sprinkler in room at end of link and in Meditation room, provide door to remain unlocked sticker on both main exit doors 1/25/2002 3:12:17 PM
BLD00-01745 FIRE-Final Inspection1/22/20021/24/20021/24/2002 12:00:00 AMAFAIL
provide fire extinguisher in penthouse and basement electrical room, elevator recall does not work, a bush is obstructing the FDC, paint curbing per sheet A1.0, place no parking signs per note 13, provide secondary containment verification for emergency generator, provide offsite sprinkler monitoring, provide floor signage and use stairs signs per note 28 and 29, install door at the ground level south shell exit, provide door on 2nd floor electrical room, verify life/safety and fire alarm and fire sprinklers at end of link and in Meditation room, provide "door to remain unlocked" sticker on both main exit doors 1/25/2002 3:06:12 PM
BLD00-01635 FIRE-Final Inspection1/23/20021/24/20021/24/2002 12:00:00 AMAPASS
life safety finaled at the 6085 N. Eagle road address 1/24/2002 3:39:05 PM
BLD01-02967 FIRE-Sprinkler Rough-in1/23/20021/24/20021/24/2002 12:00:00 AMAFAIL
Provide smoke detector, manual pull station and horn/strobe on the fire alarm system as well as 60 hour backupwith dual phone lines. Submitt plans to City of Boise. If panel is replaced HVAC units may need to be monitored. Provide exit sign at required exit, provide approved door hardware, provide tagged fire extinguishers mounted with handles at 48", provide heat in riser room (remove heat tape) and provide current inspection tag on riser. 1/24/2002 7:24:21 PM
FIR00-00644 INSP-Final Inspection1/24/20021/24/20021/24/2002 12:00:00 AMPFAIL
Added by Inspector: 430 On 1/24/2002 7:39:29 PM No elevator recall works, provide as-built drawings at FACP and with the City, provide spot type detectors in beam pockets in electrical, phone/data, mechanical and elevator rooms, basement flow switch sends no signal, damper at device M1-31 in south basement does not operate when detector is smoked, 2nd, 3rd and 4th floor flow switches do not report nor does the main flow switch, 2nd floor flow switch is programmed as a tamper, basement north stair strobe does not work, no signals are being sent off site
FIR01-00098 INSP-Final Inspection1/24/20021/24/20021/24/2002 12:00:00 AMPFAIL
Added by Inspector: 430 On 1/24/2002 7:45:28 PM provide spare heads in head box with wrench, provide caps and chains on hose valves, provide sprinkler canopies at the top of the south stairs, provide flexible coupling on 3" riser in penthouse, replace clappers in backflow preventer, verify that the 2nd, 3rd and 4th floors flow switches meet the 90 second rule, verify sprinkler at the top of the north shaft, install heat collector at the bottom of the north shaft above head, time main flow switch, send supervisory and trouble signals from the main riser room