MEC04-01628
| Final | 1/24/2005 | 1/24/2005 | 1/24/2005 12:00:00 AM | A | FAIL |
|
|
need installation guide for all fireplaces 1/24/2005 11:39:05 AM
|
MEC05-00010
| Rough-in | 1/24/2005 | 1/24/2005 | 1/24/2005 12:00:00 AM | A | PART |
|
|
r-6 insulation on supply duct at attic and crawlspace ok on this job, all future job supply air duct at attic and crawlspace to be r-8 as per 2003 IECC table 503.3.3.3 1/24/2005 12:19:40 PM
|
MEC05-00010
| Pressure Test | 1/24/2005 | 1/24/2005 | 1/24/2005 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC04-03330
| Final | 1/21/2005 | 1/24/2005 | 1/24/2005 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/21/2005 at 12:19:19 PM. Contact: ###-####.
|
MEC05-00175
| Rough-in | 1/21/2005 | 1/24/2005 | 1/24/2005 12:00:00 AM | A | PASS |
|
|
no duct in crawlspace, check for r-8 supply at final 1/24/2005 2:54:08 PM
|
MEC04-03746
| Rough-in | 1/21/2005 | 1/24/2005 | 1/24/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/21/2005 at 3:39:30 PM. Contact: ###-####.
|
MEC04-03640
| Final | 1/24/2005 | 1/24/2005 | 1/24/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 10:37:52 AM. Contact: ###-####.
|
MEC05-00175
| Rough-in | 1/24/2005 | 1/24/2005 | 1/24/2005 12:00:00 AM | P | PASS |
|
|
do in pm
|
MEC05-00249
| Final | 1/24/2005 | 1/24/2005 | 1/24/2005 12:00:00 AM | P | PASS |
|
|
###-#### Chris
|
MEC04-03330
| Final | 1/24/2005 | 1/24/2005 | 1/24/2005 12:00:00 AM | P | PASS |
|
|
do in pm
|