Inspections for the day of: Wednesday, January 24, 2007.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00336 FIR-Aging Inspection1/24/20071/24/20071/30/2007 9:29:13 AM DEFR
FIR07-00004 INSP-Sprinkler Rough-in/Hydro1/24/20071/24/20071/26/2007 8:19:22 AMPDEFR
Inspection to be completed as scheduled on 1/26.
FIR06-00921 INSP-Sprinkler Rough-in/Hydro1/23/20071/24/20071/24/2007 4:13:17 PMPCANC
contact: Jason Hord - OH Hydro Test
Phone #: ###-#### x1234
FIR06-00815 INSP-Final Inspection1/24/20071/24/20071/24/2007 4:12:57 PMPCANC
Larren, please call 1st; Phone #: ###-#### or ###-#### Internet Inspection Request from: Cathy Weisshaupt
FIR06-00877 INSP-Final Inspection1/23/20071/24/20071/24/2007 4:12:44 PMPCANC
earl; Phone #: ###-#### Internet Inspection Request from: Darla Downs
FIR06-00991 INSP-Final Inspection1/23/20071/24/20071/24/2007 4:12:31 PMPCANC
earl; Phone #: ###-#### Internet Inspection Request from: Darla Downs
FIR07-00042 INSP-Final Inspection1/24/20071/24/20071/24/2007 4:11:16 PMPCANC
No time available to complete inspection today.
FIR06-00651 INSP-Final Inspection1/22/20071/24/20071/24/2007 4:10:27 PMPDEFR
Inspection rescheduled per conversation with contractor.
BLD06-03116 FIRE-Final Inspection1/23/20071/24/20071/24/2007 3:54:34 PMAFAIL
Provide door hardware at the front entry/exits per plan review comments and notes, all remaining life safety items tested okay.
FIR06-00972 INSP-Final Inspection1/23/20071/24/20071/24/2007 3:26:27 PMACANC
No time to complete this inspeciton today.
FIR06-00977 INSP-Sprinkler Rough-in/Hydro1/23/20071/24/20071/24/2007 3:25:55 PMAPART
The dry system installation at the west portion of building B is approved for cover, also noted c/n items at the east wing dry system building B have been finished.
BLD06-01295 FIRE-Final Inspection1/23/20071/24/20071/24/2007 3:21:18 PMAPASS
Door hardware corrections verified, fire life safety inspection passed.
FIR07-00044 INSP-Supply line flush1/23/20071/24/20071/24/2007 1:02:40 PMAPART
UG fire service supply line is approved for bury, contractor needs to provide a cover at the open ended ductile riser pipe.
FIR05-00536 INSP-Sprinkler Rough-in1/23/20071/24/20071/24/2007 12:14:04 PMAPART
Overhead fire sprinkler is approved for cover at operating rooms 2, 3, and 4, second floor as marked on approved plans.
BLD06-01671 FIRE-Final Inspection1/23/20071/24/20071/24/2007 11:41:41 AMAPART
Approved for temporary occupancy per D. Hanneman until the fire lane asphalt paving and signage is complete. Noted to contractor missing knox box and signage at the FACP room door to be completed prior to final.
FIR06-00660 INSP-Final Inspection1/24/20071/24/20071/24/2007 11:38:57 AMAPASS
Fire sprinkler permit finaled.
FIR06-00920 INSP-Final Inspection1/24/20071/24/20071/24/2007 11:31:26 AMAPASS
Corrections have been verified for completion, final alarm inspeciton passed.
BLD05-01473 FIRE-Final Inspection1/23/20071/24/20071/24/2007 10:30:01 AMAPASS
Inspection for the fire sprinkler permit work passed.
FIR06-00851 INSP-Final Inspection1/19/20071/24/20071/24/2007 7:30:06 AMACANC
Phone #: ###-#### Inspection cancelled from web by: Terry Owsley
FIR05-00659 INSP-Supply line flush1/23/20071/24/20071/24/2007 12:00:00 AMACANC
BRIAN; Phone #: ###-#### Internet Inspection Request from: Victoria Beall brian cancelled 3:40
FIR06-00658 INSP-Supply line flush1/23/20071/24/20071/24/2007 12:00:00 AMACANC
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles