Inspections for the day of: Tuesday, January 24, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00371 INSP-Sprinkler Rough-in1/24/20121/24/20121/25/2012 10:33:10 AMPFAIL
Additional upright sprinkler coverage is required due to a full height wall.
FIR11-00674 INSP-Sprinkler Rough-in1/24/20121/24/20121/24/2012 3:10:42 PMPPASS
ok to cover
FIR12-00016 INSP-Sprinkler Rough-in1/24/20121/24/20121/24/2012 3:09:14 PMPPASS
Piping above the hard lids is ok to cover. The new uprights around the full height wall are also complete.
BLD12-00012 FIRE-Conference1/24/20121/24/20121/24/2012 2:03:39 PMPDONE
Darren and I spoke about the two doors that will not arrive prior to the building being occupied. I was ok with verifying their install and hardware when a building final was requested at the same time the duct smoke detectors were addressed.
FIR11-00479 INSP-Sprinkler Rough-in/Hydro1/24/20121/24/20121/24/2012 1:56:49 PMPPASS
The hydro test at the riser passed.
FIR11-00674 INSP-Sprinkler Rough-in1/24/20121/24/20121/24/2012 11:59:11 AMPFAIL
Need to provide retaining straps and correct hanger attachment to the deck for the pendant in the closet. Currently the all thread rod has been bent on this hanger. Re-inspection has been scheduled for this afternoon.
FIR11-00479 INSP-Sprinkler Rough-in/Hydro1/23/20121/24/20121/24/2012 11:50:31 AMAPART
The hydro test for the system at the new lobby passed. The hydro test for the system at the new riser failed possibly due to the door to the riser room being left open. This test is rescheduled for this afternoon.
FIR11-00215 INSP-Final Inspection1/23/20121/24/20121/24/2012 11:29:18 AMACANC
Canceled per phone conversation with Alex Phone #: ###-####