ESC13-00651
| General Inspection | 1/21/2014 | 1/21/2014 | | | |
|
|
|
MIS13-00333
| BLD-Conference | 1/21/2014 | 1/24/2014 | 1/24/2014 5:03:07 PM | P | CANC |
|
|
|
BLD13-02530
| BLD-Framing/Rough-in | 1/22/2014 | 1/24/2014 | 1/24/2014 3:54:13 PM | P | PASS |
|
|
Travis Phone #: ###-####
|
BLD13-02432
| BLD-Energy code compliance | 1/23/2014 | 1/24/2014 | 1/24/2014 3:52:48 PM | A | PASS |
|
|
JOHN Phone #: ###-####
|
BLD13-03340
| BLD-Final | 1/22/2014 | 1/24/2014 | 1/24/2014 3:31:09 PM | A | PASS |
|
|
Chris phone ###-####
|
BLD13-03340
| DOC - Permit Finaled | 1/24/2014 | 1/24/2014 | 1/24/2014 3:30:18 PM | P | PASS |
|
|
|
BLD12-00551
| BLD-Ceiling Grid Inspection | 1/24/2014 | 1/24/2014 | 1/24/2014 1:57:17 PM | P | PASS |
|
|
Jesse Phone #: ###-####
|
GCB13-00128
| GCB-Framing | 1/23/2014 | 1/24/2014 | 1/24/2014 12:17:49 PM | A | PASS |
|
|
Travis ###-#### Talked to travis. He said Tony went through the framing and said it was OK.....except for a strap at double top plate and rough-in approvals from all trades. These are done. I walked through frame....appears OK.
|
GCB13-00025
| GCB-Final | 1/23/2014 | 1/24/2014 | 1/24/2014 11:19:57 AM | A | PASS |
|
|
jOE ###-#### CALL FIRST
|
BLD13-03340
| BLD-Conference | 1/22/2014 | 1/24/2014 | 1/23/2014 7:24:06 AM | P | CANC |
|
|
Brian phone ###-####
|
MIS13-00326
| BLD-Conference | 1/21/2014 | 1/24/2014 | 1/23/2014 7:23:34 AM | A | CANC |
|
|
Vernon phone ###-####
|