ELE18-00309
| Conference | 1/23/2018 | 1/24/2018 | 1/24/2018 3:05:42 PM | P | DONE |
|
|
Conference for pre-inspection on non-permitted work. Phone #: ###-#### Inspection requested via web by David Seilheimer Discussed the electrical in new walls that were added under BLD17-01266. This electrical contactor hired to verify walls noted on BLD has wiring was installed to 2014 NEC. Concerned with wiring associated with switching. Contactor to open drywall on 3 walls built to create 2 offices and a break room to inspect wiring and will call for a rough in inspection at that time. Electrical contactor taking liability for this work and shall open any walls needed to have access to wiring in question.
|
ELE17-02780
| Final | 1/24/2018 | 1/24/2018 | 1/24/2018 1:56:58 PM | A | PASS |
|
|
or ###-#### Phone #: ###-#### Inspection requested via web by Mark M No card posted. Final ok
|
ELE17-04372
| Final | 1/24/2018 | 1/24/2018 | 1/24/2018 1:56:13 PM | P | PASS |
|
|
AJ Phone #: ###-#### Final ok
|
ELE17-04372
| Electrical Rough-In | 1/24/2018 | 1/24/2018 | 1/24/2018 1:55:53 PM | P | PASS |
|
|
AJ Phone #: ###-#### All equipment listed for wet locations. Rough in ok
|
ELE17-03140
| Electrical Rough-In | 1/23/2018 | 1/24/2018 | 1/24/2018 10:15:00 AM | A | CANC |
|
|
Terry Cushing is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce Called contact. No new work done yet. Valuation corrected. Thank You
|
ELE17-03605
| Final | 1/23/2018 | 1/24/2018 | 1/24/2018 10:10:59 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall 300.15- Each wire shall terminate in a box. Wire out wall off patio unit 102. 314.25- All boxes shall have covers. 102 disposal not trimmed.
|
ELE17-04214
| Electrical Rough-In | 1/23/2018 | 1/24/2018 | 1/24/2018 9:23:19 AM | A | PASS |
|
|
Luke Phone #: ###-#### Procedure room hard lid rough in ok cover
|
ELE18-00212
| Electrical Rough-In | 1/23/2018 | 1/24/2018 | 1/24/2018 9:22:42 AM | A | FAIL |
|
|
Part for cover- Luke Phone #: ###-#### demizing wall cover only. 300.4- MC cable shall be protected from physical damage where run thru hole that do not maintain 1 1/4" from framing surface. Shallow studs used for demizing wall. Every stud needs a nail plate or remove wiring and reinstall to back wall. 330.30- MC shall be secured with in 12" of a boxes. 5 or 6 locations on demizing wall.
|