PLM19-05432
| Final | 1/24/2020 | 1/24/2020 | 1/24/2020 4:03:07 PM | P | PASS |
|
|
|
PLM19-04809
| Groundwork | 1/24/2020 | 1/24/2020 | 1/24/2020 4:02:04 PM | P | PASS |
|
|
please call cody prior to arrival for access Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
PLM20-00221
| Plumbing Rough-in | 1/23/2020 | 1/24/2020 | 1/24/2020 4:01:47 PM | P | PASS |
|
|
David Phone #: ###-#### r-in inside the house
|
PLM19-05432
| Final | 1/24/2020 | 1/24/2020 | 1/24/2020 3:16:13 PM | P | NH |
|
|
Call me for access, please. Phone #: ###-#### Inspection requested via web by Troy Pherigo
|
PLM20-00241
| Final | 1/23/2020 | 1/24/2020 | 1/24/2020 12:18:59 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by DANIELLE BROOKSHIRE
|
PLM20-00241
| Water and/or Sewer | 1/23/2020 | 1/24/2020 | 1/24/2020 12:18:44 PM | A | PASS |
|
|
Kathy Phone #: ###-####
|
PLM20-00241
| DOC - Permit Finaled | 1/24/2020 | 1/24/2020 | 1/24/2020 12:18:32 PM | P | PASS |
|
|
vidio good
|
PLM19-04987
| Final | 1/23/2020 | 1/24/2020 | 1/24/2020 11:04:54 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Tobi Wilson 1. Water heater condensate cannot termimate outside due to freezing. 2, T&P must terminate no less than 6" above grade. 3. Install a 90 on the t&p termination.
|
PLM20-00302
| Water and/or Sewer | 1/24/2020 | 1/24/2020 | 1/24/2020 10:12:22 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by phil duman
|
PLM20-00302
| DOC - Permit Finaled | 1/24/2020 | 1/24/2020 | 1/24/2020 10:12:03 AM | P | PASS |
|
|
|
PLM20-00274
| Water Heater Final | 1/23/2020 | 1/24/2020 | 1/24/2020 9:56:24 AM | A | PASS |
|
|
Please call Jeremy on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks
|
PLM20-00288
| Water Heater Final | 1/22/2020 | 1/24/2020 | 1/24/2020 9:28:31 AM | A | FAIL |
|
|
Please call Morgan when on the way over. Phone #: ###-#### Inspection requested via web by Aaron Alandt 1. Flue needs to grade 1/4" per foot to the tee wye. 2. Drill an 1/8" hole at the lowest point of the t&p drain. 3. Install CO detectors. 4. Check the flue height on the roof. 5. Turn off the drain valve. It's in the on position.
|