BLD00-01563
| BLD-Framing/Rough-in | 1/25/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/25/2001 at 05:55:06. Contact: ###-####. basement h-3 occ need to review plan in furthere detial as to chem exsust duct and tunnel coridor wall ref. 1/25/2001 5:51:41 PM
|
BLD00-03143
| BLD-Framing/Rough-in | 1/24/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 10:09:41. Contact: ###-####. part of wall fire safing in place still pending deck engineering before placement/ eifs wall rfi needed for scruber 2 nd floor. 1/25/2001 11:43:27 AM
|
BLD00-03573
| BLD-Framing/Rough-in | 1/24/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 13:14:06. Contact: ###-####.tennet wall ok pending bath room. 1/25/2001 10:03:04 AM
|
BLD00-01563
| BLD-Concrete | 1/24/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 14:22:07. Contact: ###-####. placed with special insp. pending report. 1/25/2001 5:52:12 PM
|
BLD00-03664
| BLD-Final | 1/25/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | P | PASS |
|
|
harold ###-####
|
BLD00-03430
| BLD-Final | 1/25/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | P | PASS |
|
|
harold ###-####
|
BLD00-02931
| BLD-Final | 1/25/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | P | CANC |
|
|
dean -- ###-#### fn-- dean cancel
|