BLD00-03598
| BLD-Framing/Rough-in | 1/24/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | A | FAIL |
|
|
SHEAR WALL -NICK ###-#### c/n issued, 1) Hd missing corner of moring room, 2) renail shear panels in compliance of shear plan, 3) Blocks needed at plywood joints on shear panels at various locations, 4) instal MSTC 40 straps per plans on upstair bedroom 4 per plans, 5) Nailing needed above hd straps 1/25/2001 12:00:18 PM
|
BLD98-02194
| BLD-Final | 1/24/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | A | FAIL |
|
|
FN INSP STEVE-- ###-#### c/n no access, could not reach via telephone. 1/25/2001 9:55:48 AM
|
BLD00-02255
| BLD-Energy code compliance | 1/24/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | A | PASS |
|
|
###-#### MARSHALL ENRY CODE ok to cover 1/25/2001 11:06:22 AM
|
BLD00-02467
| BLD-Final | 1/24/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | A | FAIL |
|
|
###-#### Kevin call to meet there /smoke detectors needed per permit conditions. 1/25/2001 10:18:16 AM
|
BLD01-00018
| BLD-Footing | 1/24/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | A | PART |
|
|
###-#### ready at 11setback, soil ok, reviewed rebar requirements on plans, not installed at time of inspection. 1/25/2001 11:15:26 AM
|
MIS00-00299
| BLD-Conference | 1/24/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | A | PASS |
|
|
compaint on working over stop work order on shed, 325. Checked with inspector 425,does not appear like any further construction activities has been done. 1/25/2001 9:21:51 AM
|
MEC01-00180
| Rough-in | 1/25/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/25/2001 at 07:08:29. Contact: ###-####. 1/25/2001 10:55:51 AM
|
BLD00-03001
| BLD-Framing/Rough-in | 1/25/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | P | PASS |
|
|
Bob ###-####: ok to insulate 1/25/2001 1:58:57 PM
|
BLD00-03375
| BLD-Final | 1/25/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | P | PASS |
|
|
fn matt ###-#### letter of comp. issued 1/25/2001 2:24:58 PM
|
BLD01-00075
| BLD-Footing | 1/24/2001 | 1/25/2001 | 1/25/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 16:47:55. Contact: ###-####. Cancelled by contractor via telephone. 1/25/2001 2:39:00 PM
|