Inspections for the day of: Friday, January 25, 2002.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02357 BLD-Energy code compliance1/24/20021/25/20021/25/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/24/2002 at 12:06:02. Contact: ###-####. Additional test result for Thermospray cellulose insulation does not require a poly. vapor barrier or install the vapor barrier per Boise City Energy requirements. 1/25/2002 9:52:14 AM
MEC02-00194 Final1/24/20021/25/20021/25/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/24/2002 at 12:35:17. Contact: ###-####.
MEC02-00194 Pressure Test1/24/20021/25/20021/25/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/24/2002 at 12:35:38. Contact: ###-####.
BLD02-00046 BLD-Foundation1/24/20021/25/20021/25/2002 12:00:00 AMAPART
###-#### wip 10% ready 1/25/2002 9:59:33 AM
BLD01-02512 BLD-Final1/24/20021/25/20021/25/2002 12:00:00 AMAPASS
###-#### Ok to issue temp. c. of c.--perm. after zoning perm. sign off. 1/25/2002 8:59:41 AM
BLD01-01667 BLD-Other1/24/20021/25/20021/25/2002 12:00:00 AMAPASS
###-#### Interior 1-hr wall ok 1/25/2002 8:58:06 AM
BLD02-00108 BLD-Foundation1/24/20021/25/20021/25/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/24/2002 at 18:19:51. Contact: . wip--5% complete at time of inspection. 1/25/2002 9:20:04 AM
BLD01-03188 BLD-Footing1/25/20021/25/20021/25/2002 12:00:00 AMPPART
###-#### wip--5% ready for inspection--Builder to change position of house--will still comply with required city setbacks. 15' in front--at least 20' from rear of sidewalk to front of garage. 1/25/2002 1:37:54 PM
BLD01-03153 BLD-Other1/25/20021/25/20021/25/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/25/2002 at 09:20:17. Contact: . SHEAR--OK TO SIDE. 1/25/2002 12:53:25 PM
BLD01-02357 BLD-Energy code compliance1/25/20021/25/20021/25/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/25/2002 at 10:05:22. Contact: ###-####. ok to cover 1/25/2002 1:30:51 PM
BLD01-03011 BLD-Framing/Rough-in1/25/20021/25/20021/25/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/25/2002 at 10:37:19. Contact: ###-####. SHEAR--Bottom floor ok--2nd floor not ready for inspection. 1/25/2002 1:21:20 PM
BLD01-03011 BLD-Energy code compliance1/25/20021/25/20021/25/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/25/2002 . Ok to cover 1/25/2002 3:10:00 PM
BLD01-03011 BLD-Framing/Rough-in1/25/20021/25/20021/25/2002 12:00:00 AMPPASS
Scheduled by Inspector: 420 On 1/25/2002 1:23:07 PM Prior entry was inspector mistake (shear--dated 1-25-02) Correction notice items ok-- 1/25/2002 3:09:36 PM
BLD01-02562 BLD-Framing/Rough-in1/22/20021/25/20021/25/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/22/2002 at 14:55:55. Contact: ###-####. 30"' X 30" supply air cannot be in 1-Hour opening unless smoke and fire damper is installed with an equi. fire rating. Relocation outside the 1-Hr wall is also an option. 1/25/2002 2:26:41 PM
BLD01-02375 BLD-Framing/Rough-in1/24/20021/25/20021/25/2002 12:00:00 AMPPART
###-#### SHEAR--Bottom floor ok--2nd floor not ready for inspection. 1/25/2002 1:22:44 PM