Inspections for the day of: Wednesday, January 25, 2006.
Number of inspections: 11
Percentage of inspections complete: 91 %
Percentage of inspections not complete: 9 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00490 INSP-Sprinkler Rough-in/Hydro1/23/20061/23/2006 A 
Check for completion.
FIR05-00190 INSP-Final Inspection1/24/20061/25/20061/25/2006 3:44:39 PMAPASS
Fire sprinkler work completed satisfactory, permit finaled.
FIR05-00425 INSP-Sprinkler Rough-in/Hydro1/25/20061/25/20061/25/2006 3:04:20 PMPNR
Contractor intended inspection to be performed on 1/26 in the pm per telephone conversation.
BLD05-03044 FIRE-Final Inspection1/25/20061/25/20061/25/2006 2:39:24 PMPPASS
Vanilla finish life safety is acceptable, the attatched sprinkler permit final pending a fire alarm permit for supervision of the wpi.
FIR05-00899 INSP-Final Inspection1/25/20061/25/20061/25/2006 2:34:42 PMPPART
Overhead fire sprinkler work is satisfactory, tile and escutcheons have been installed. Final pending testing of the tamper switch at the newly installed wall post indicator. The new outside tamper switch for the wpi has been connected without an alarm permit. This work will require permitting, inspection and approval prior to final of the fire sprinkler permit.
FIR05-00883 INSP-Sprinkler Rough-in1/24/20061/25/20061/25/2006 12:21:47 PMAPART
Approved plans were not available for review at the time of inspection (locked in job trailer), the installation of an 8" supply, ductile riser, and thrust block verified. Depth of bury and bedding is okay, need to provide seismic clearance method for the ductile riser at floor slab and protect the open riser pipe end from debris.
FIR05-00712 INSP-Final Inspection1/24/20061/25/20061/25/2006 12:13:26 PMAPART
Partial approval for phase 1 only. Third floor guest rooms, common corridor, nac panel, and attic tested okay, cm detectors on the first floor tested, elevator and equipment room tested, signals at central station verified. An additional sprinkler head is to be installed in the elevator equip. room- this will require an additional heat detector possible smoke detector relocation( to be tested and shown on approved plans when installed), provide permanent signage at the FACP room door, the smoke alarms at guest rooms facing the courtyard and adjacent to the fire doors in the corridors need to have the dust covers removed prior to final, show added a/v in the kitchen on approved plans, provide updated map at the panel. NFPA 72 form signed for phase one.
FIR04-00166 INSP-Alarm Testing1/24/20061/25/20061/25/2006 11:52:47 AMAPART
Tested functionality of the notification and voice evac systems only, approved plans for the 8th floor not available for review.
FIR05-00330 INSP-Alarm Testing1/24/20061/25/20061/25/2006 11:49:56 AMAPART
Tested functionality of notification and voice evac devices on floors 11,9,7,6,5,4, and basement levels, tested pulls, smokes, DD, sprinkler tampers, door release, and nac batteries on the basement and 4th floors. Door closure sequence at 4th floor and threshold hang up in the basement repaired while on site, need to provide updated map at the panel, provide resubmittals reflecting all field changes in the basement (Angels). An additional inspection(s) will be required to complete testing for the remainder of items not tested today due to time constraints per agreement.
FIR05-00048 INSP-Alarm Testing1/24/20061/25/20061/25/2006 11:30:49 AMAPART
Tested functionality of notification devices and voice evac only, no approved plans on site for review or verification of the field installation
FIR05-00712 INSP-Final Inspection1/24/20061/25/20061/24/2006 11:58:14 AMACANC
Forrest, We would like to schedule another inspection between 9:00 or 10:00. Any questions call us ; Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick