Inspections for the day of: Wednesday, January 25, 2006.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-04154 Final1/25/20061/25/20061/25/2006 3:34:12 PMPNR
WE ARE READY FOR A FINAL INSPECTION OF THE BATHROOM AND SERVICE COORRECTIONS; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH wiring to hot water heater not done, no inspection for wiring to & in back building. t/w doug keith
ELE05-04646 Final1/25/20061/25/20061/25/2006 3:32:01 PMPPASS
Warren; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok final
ELE06-00285 Electrical Rough-In1/25/20061/25/20061/25/2006 3:31:33 PMPNR
John ###-#### -- call 1st before insp for access t/w john missing wall spaces & what areas he wired.. furnace wiring connection.
ELE06-00272 Rough-In Permanent Service1/24/20061/25/20061/25/2006 3:29:26 PMPPART
gary-- ###-#### cell conf. work clearance in front of panel. water ground, sunlight resistant wire for over head, bathrm 20amp. outlet, & bare grounded wire from meterbase to panel
ELE06-00274 Electrical Rough-In1/24/20061/25/20061/25/2006 10:17:24 AMAPASS
Shawn -- ###-#### -- call 1st before insp ok cover ri t/w contractor regarding 2ft walls in kitchen area.
ELE05-04548 Final1/24/20061/25/20061/25/2006 9:38:51 AMAPASS
rick ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok final
ELE06-00283 Rough-In Permanent Service1/24/20061/25/20061/25/2006 9:37:54 AMAPASS
Scheduled by a contractor via Hello! on 1/24/2006 at 4:15:32 PM. Contact: ###-####. ok cover ri p/s u/g n ok
ELE06-00282 Temporary Service1/24/20061/25/20061/25/2006 8:20:45 AMAPASS
rick ###-#### t/s u/g n ok
ELE06-00274 Permanent Service1/25/20061/25/20061/25/2006 12:00:00 AMPPASS
Shawn -- ###-#### -- call 1st before insp p/s u/g reconnect ok note check water jumper hot & cold at h2o heater