Inspections for the day of: Friday, January 25, 2008.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-02796 Final1/25/20081/25/20081/25/2008 4:06:24 PMPPASS
looked at signs, ok to final
ELE08-00184 Final1/25/20081/25/20081/25/2008 3:18:18 PMPPASS
Thanks, Andrea. Phone #: ###-#### x0000 Internet Inspection Request from: Andrea Creek ok to final
ELE08-00087 Electrical Rough-In1/24/20081/25/20081/25/2008 1:48:16 PMPCANC
Wall inspection. Please call Casey @ ###-#### prior to inspection. Phone #: ###-#### Internet Inspection Request from: Kristopher Wilson could not get ahold of contact, (left phone at home), went to job, called office, finally got hold of electrician, got in building, had security breach, they would not allow entry, ran out of time waiting, told to call for another day
ELE08-00161 Final1/24/20081/25/20081/25/2008 10:28:14 AMAPASS
justin Phone #: ###-#### ok to final
ELE08-00161 Electrical Rough-In1/25/20081/25/20081/25/2008 10:21:54 AMAPASS
justin Phone #: ###-#### ric ok
ELE07-02179 Conference1/24/20081/25/20081/25/2008 10:18:45 AMADONE
heidi Phone #: ###-#### met owner talked about receptacle spacing, make-up, 6" free conductor length, ground metal boxes, told owner that we can only come out 2 times or he will have to get licensed contractor to do the work, talked about afci breakers, clean up panel, nm cable in connectors, stapling, nail plates, 1 1/4" for holes and nm cable, told to have all job ready for ri inspection
ELE06-00311 Final1/23/20081/25/20081/25/2008 9:17:29 AMACANC
craig Phone #: ###-#### see conference
ELE06-00311 Conference1/25/20081/25/20081/25/2008 9:16:41 AMADONE
craig Phone #: ###-#### met owner, talked about receptacle mounting, face plates, panel schedule and hooking up 3 phase add-a-phase