Inspections for the day of: Friday, January 25, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01020 FIRE-Final Inspection1/24/20081/25/20081/30/2008 1:58:15 PMAPART
Pending verification of a fire alarm supervisory switch at the main control valve for the fire sprinkler system.
BLD06-01830 FIRE-Final Inspection1/25/20081/25/20081/25/2008 4:27:21 PMPFAIL
Missing suite address numbers, manual flush bolts at the main entry/exit inactive door leaf are not permitted, need provision to test emergency lighting for functionality.
FIR07-00846 FIR-Aging Inspection1/25/20081/25/20081/25/2008 4:25:23 PM DEFR
Work in progress, pending site inspection requests.
FIR07-00997 INSP-Final Inspection1/24/20081/25/20081/25/2008 3:46:05 PMAPART
Overhead rough-in inspection only, noted one missing ret. strap, one missing hanger, two overspaced heads at the hard lid ceiling restroom areas, the antifreeze loop piping is not yet tied in to the riser, riser not complete at this time, see approved plan set for annotations, hydrostatic testing not ready due to start pressure well below 200psi., remainder of OH rough-in is acceptable.
BLD06-03584 FIRE-Final Inspection1/22/20081/25/20081/25/2008 2:56:42 PMAFAIL
EAS per plan documents is not complete at this time, emergency lighting and exit signage tested okay, need to post one PFE on the wall within travel distances on the second floor as discussed.
BLD06-00456 FIRE-Final Inspection1/24/20081/25/20081/25/2008 1:16:16 PMANR
Need project related fire alarm and sprinkler permit final inspections and approvals prior to building life safety final.
BLD07-02928 FIRE-Final Inspection1/24/20081/25/20081/25/2008 1:10:00 PMAFAIL
Need to adjust alarm notification coverage due to overspacing caused by wall removal, finishes are not complete, two existing SD have had bases removed due to construction in progress.
BLD07-02755 FIRE-Final Inspection1/24/20081/25/20081/25/2008 1:07:24 PMANR
Project is not in condition for final life safety due to finishes underway, provide ceiling patch at the dry system riser room, need fire alarm as-built plans as discussed, EM lights and exit signs tested okay.
FIR07-00947 INSP-Final Inspection1/24/20081/25/20081/25/2008 1:04:46 PMAPART
Need as-built plans reflecting field modifications, need to relocate SD above the dry system riser away from the air diffuser or relocate grill, provide one additonal strobe at the basement area remodel (attatched project related building permits BLD07-02928) okay to include on this alarm permit as discussed.