ELE10-02693
| Final | 1/25/2011 | 1/25/2011 | 1/25/2011 2:58:52 PM | P | PASS |
|
|
>> Inspection requested via web by Neal Rumsey ok final
|
ELE11-00102
| Rough-In Permanent Service | 1/24/2011 | 1/25/2011 | 1/25/2011 1:34:30 PM | A | PASS |
|
|
THANKS, BILL Phone #: ###-#### >> Inspection requested via web by Bob Glenn ri ok, p/s u/g n ok
|
ELE11-00142
| Electrical Rough-In | 1/25/2011 | 1/25/2011 | 1/25/2011 12:39:18 PM | P | FAIL |
|
|
Installing solar light pole. Phone #: ###-#### >> Inspection requested via web by joel smith met with supplier, BCC 4-05-33(A)(B) all electrical equipment shall be listed by a nationally recognized testing laboratory
|
ELE10-02849
| Rough-In Permanent Service | 1/24/2011 | 1/25/2011 | 1/25/2011 10:53:06 AM | A | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Zane Robertson called, needs to box recpt in mbr, entry, provide 1 1/4" for range wire, protect wire at garage scuttle
|
ELE11-00144
| Rough-In Permanent Service | 1/24/2011 | 1/25/2011 | 1/25/2011 10:17:18 AM | A | FAIL |
|
|
JOHN Phone #: ###-#### met contractor, NEC 352.26 too many bends in pvc for u/g
|
ELE11-00135
| Conference | 1/24/2011 | 1/25/2011 | 1/25/2011 9:34:57 AM | A | DONE |
|
|
Please contact Dave Bradshaw ###-#### to set cinference Phone #: ###-#### >> Inspection requested via web by Scott Campbell reviewed t/s requirements for job trailers
|
ELE11-00139
| Final | 1/24/2011 | 1/25/2011 | 1/25/2011 8:29:16 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by John VanZandt ok final, signed card
|
ELE10-00992
| ELE-Aging Inspection | 1/25/2011 | 1/25/2011 | 1/25/2011 6:19:45 AM | | DONE |
|
|
suc
|
ELE10-01001
| ELE-Aging Inspection | 1/25/2011 | 1/25/2011 | 1/25/2011 6:18:40 AM | | DONE |
|
|
suc
|
ELE10-00670
| Final | 1/25/2011 | 1/25/2011 | 1/25/2011 6:16:47 AM | A | PASS |
|
|
ok final
|