FIR12-00679
| INSP-Sprinkler Rough-in | 1/25/2013 | 1/25/2013 | 1/25/2013 10:56:06 AM | P | PART |
|
|
Ductile UG fire supply line stub-in and riser install verified. Discussed thrust blocking and joint restraint.
|
BLD12-01719
| FIRE-Final Inspection | 1/23/2013 | 1/25/2013 | 1/25/2013 10:53:37 AM | P | PASS |
|
|
Life safety inspection passed.
|
BLD12-02776
| FIRE-Final Inspection | 1/24/2013 | 1/25/2013 | 1/25/2013 10:52:31 AM | A | PASS |
|
|
Fire life safety inspection completed acceptable.
|