BLD14-01825
| FIRE-Final Inspection | 1/24/2017 | 1/25/2017 | 1/25/2017 2:28:44 PM | A | PART |
|
|
Life Safety inspection complete. Left pair of double doors to patio area needs repair, exit will not be allowed through door until patio area is complete.
|
BLD14-01826
| FIRE-Final Inspection | 1/24/2017 | 1/25/2017 | 1/25/2017 2:25:46 PM | A | PASS |
|
|
FIre Life Safety Pass.
|
FIR15-00784
| INSP-Final Inspection | 1/24/2017 | 1/25/2017 | 1/25/2017 12:24:11 PM | A | PASS |
|
|
Completed south side of building. Function test completed satisfactory. Scope of work complete. Permit finaled.
|
NAF16-00034
| INSP-Final | 1/24/2017 | 1/25/2017 | 1/25/2017 12:18:21 PM | A | PART |
|
|
Operation test completed (flow test w/outside bell, tampers reporting to panel, forward flow). Fire Alarm contractor could not be present, so no monitoring capability. System was not left in active status.
|
NAF16-00034
| INSP-Sprinkler Rough-in/Hydro | 1/24/2017 | 1/25/2017 | 1/25/2017 12:16:04 PM | A | PASS |
|
|
Hydrostatic test for overhead and racking completed satisfactory.
|