ELE13-03310
| ELE-Aging Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 3:40:34 PM | | FAIL |
|
|
waiting on contractor
|
ELE17-01458
| Permanent Service | 1/25/2018 | 1/25/2018 | 1/25/2018 3:28:36 PM | P | PASS |
|
|
Inspect burn tower service to energize Phone #: ###-#### Inspection requested via web by Jeremy Cloud...p/s u/g new ok
|
ELE17-01458
| Electrical Rough-In | 1/25/2018 | 1/25/2018 | 1/25/2018 3:28:14 PM | P | PASS |
|
|
Inspect burn tower service to energize Phone #: ###-#### Inspection requested via web by Jeremy Cloud....floor 3, floor 5, and roof top slab for concrete pours verified ok...extensions from each floor
|
ELE17-02340
| Final | 1/25/2018 | 1/25/2018 | 1/25/2018 2:35:02 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt...all outlets in garages shall have GFI protection
|
ELE17-03299
| Final | 1/25/2018 | 1/25/2018 | 1/25/2018 2:34:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt...ok to final
|
ELE17-04057
| Final | 1/24/2018 | 1/25/2018 | 1/25/2018 1:37:07 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Steve Craig....1) all outlets need completed with power-outlets below counter have no power, unable to verify GFI protection 2) OCPD on hot wells are too large-15A max on nameplate 3) roof top units need labelled 4) cooler cases need finished, outlets need mounted to proper cover plates-2 of them
|
ELE18-00229
| Final | 1/25/2018 | 1/25/2018 | 1/25/2018 12:44:41 PM | P | NH |
|
|
Contact is Todd Sellman if needed. Phone #: ###-#### Inspection requested via web by Todd Sellman...unable to get access to where work was done...contractor needs to schedule time to meet to get access
|
ELE18-00148
| Final | 1/25/2018 | 1/25/2018 | 1/25/2018 12:18:36 PM | P | NR |
|
|
Door code is 1420 Phone #: ###-#### Inspection requested via web by MIKE HAGERTY.. not ready...waiting on occupency sensors
|
ELE17-04354
| Final | 1/25/2018 | 1/25/2018 | 1/25/2018 12:14:35 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot...ok to final
|
ELE17-03384
| Electrical Rough-In | 1/25/2018 | 1/25/2018 | 1/25/2018 11:49:45 AM | P | CANC |
|
|
Please add final inspection for Friday if possible.
Thanks Phone #: ###-#### Inspection requested via web by CHRIS CARMINE...needed final, rescheduled for friday 1/26
|
ELE17-02858
| Final | 1/24/2018 | 1/25/2018 | 1/25/2018 11:02:29 AM | A | PASS |
|
|
Final Electrical Inspection Phone #: ###-#### Inspection requested via web by Bryan Atkins...ok to final
|
ELE17-03605
| Final | 1/24/2018 | 1/25/2018 | 1/25/2018 10:16:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE17-03433
| Final | 1/24/2018 | 1/25/2018 | 1/25/2018 10:12:09 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Tyler Ridley...
1) breaker lock oput needs installed on OCPD of dishwasher circuit 2) romex shall be completely protected from physical damage-kit island flex too short 3) where metal flex is used it shall terminate in a box with means of attachment-metal box for island outlet 4) the panel shall be labelled completely and legibily-breakers mark spares are powering circuits 5) down stairs bed nedds outlet installed on 30" wall space-was not completed as per rough in inspection
|
ELE18-00323
| Electrical Rough-In | 1/24/2018 | 1/25/2018 | 1/25/2018 9:14:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jesse Fuentes...ok to cover
|
ELE17-04335
| Final | 1/24/2018 | 1/25/2018 | 1/25/2018 8:33:53 AM | A | PASS |
|
|
if you have trouble getting in, please call Chase at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Cyndi Dale...ok to final
|