PLM17-01210
| PLM-Aging Inspection | 1/25/2018 | 1/25/2018 | 1/30/2018 11:07:48 AM | | PEND |
|
|
contractor to schedule
|
PLM17-03952
| Final | 1/23/2018 | 1/25/2018 | 1/26/2018 10:46:36 AM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Dennis Seward. 1. Pipe the electric water heater t&p drain to an approved waste location with an air gap. 2. Seperate the carbonator waters from all other lines. 3. Install double check valves at the coffee/tea makers and ice machines.
|
PLM17-03289
| Final | 1/25/2018 | 1/25/2018 | 1/25/2018 3:45:02 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Tom Maxwell. The water heater drain pan must be metallic and drain to the hub drain or outside.
|
PLM17-02641
| Final | 1/25/2018 | 1/25/2018 | 1/25/2018 3:43:47 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Tom Maxwell. The water heater drain pan must be metallic and drain to the hub drain or outside.
|
PLM18-00346
| Groundwork | 1/25/2018 | 1/25/2018 | 1/25/2018 3:07:40 PM | P | PASS |
|
|
Please accommodate a 4 o''clock inspection. Phone #: ###-#### Inspection requested via web by David Scaggs
|
PLM18-00321
| Final | 1/24/2018 | 1/25/2018 | 1/25/2018 2:34:10 PM | P | PASS |
|
|
INSTALLER DAVID ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt
|
PLM18-00343
| Final | 1/25/2018 | 1/25/2018 | 1/25/2018 2:18:21 PM | P | PASS |
|
|
Front door code1420 Phone #: ###-#### Inspection requested via web by Robert Madrigal
|
PLM17-03094
| Plumbing Rough-in | 1/25/2018 | 1/25/2018 | 1/25/2018 2:08:13 PM | P | FAIL |
|
|
Check grade on the overhead and trap arms
|
PLM17-03093
| Plumbing Rough-in | 1/24/2018 | 1/25/2018 | 1/25/2018 2:07:26 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03675
| Plumbing Rough-in | 1/24/2018 | 1/25/2018 | 1/25/2018 1:51:49 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Already inspected
|
PLM17-04859
| Plumbing Rough-in | 1/24/2018 | 1/25/2018 | 1/25/2018 1:39:01 PM | P | PASS |
|
|
JOB # 51171 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM18-00298
| Plumbing Rough-in | 1/25/2018 | 1/25/2018 | 1/25/2018 1:28:55 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Semsudin Konjuhovac
|
PLM18-00325
| Groundwork | 1/24/2018 | 1/25/2018 | 1/25/2018 1:03:58 PM | A | NR |
|
|
JOB CONTACT - MEL ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. The groundwork isn't complete. The back to back wc's must enter through a fixture fitting. An approved set of plans must be provided for inspection
|
PLM18-00328
| Water Heater Final | 1/24/2018 | 1/25/2018 | 1/25/2018 10:06:33 AM | A | NH |
|
|
Jeffrey ###-#### Phone #: ###-#### Inspection requested via web by curtis rowe
|
PLM18-00323
| Water Heater Final | 1/24/2018 | 1/25/2018 | 1/25/2018 9:39:57 AM | A | FAIL |
|
|
homeowner to be present for inspection, George T. Phone #: ###-#### Inspection requested via web by Mike Dunson. Provide co detectors within 20 feet of all bedrooms.
|
PLM17-04921
| Final | 1/24/2018 | 1/25/2018 | 1/25/2018 9:02:15 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers. Pipe the t&p to the garage floor then reschedule
|
PLM18-00177
| Groundwork | 1/25/2018 | 1/25/2018 | 1/25/2018 8:37:23 AM | A | PASS |
|
|
Hi Dan, Groundwork for new drinking fountain by NW front entrance behind visqueen area. Any questions call Jim Little. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM17-02069
| PLM-Aging Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 8:09:57 AM | | PASS |
|
|
|
PLM17-02069
| DOC - Permit Finaled | 1/25/2018 | 1/25/2018 | 1/25/2018 8:09:46 AM | P | PASS |
|
|
|