ELE18-02181
| Final | 1/24/2019 | 1/25/2019 | 1/25/2019 2:31:42 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Bryan Atkins 110.3- GFCI on north wall will not trip. 210.8- Single phase up to 50 amp and 3- phase receptacles up to 100 amp 150 volts to ground or less shall have GFCI protection. Welder and plasma. 330.30- MC cable shall be secured with in 12" of boxes other than fixture whips. North door opener. 400.5- 6-3 flexible cords with 3 current carrying conductors ampacity shall not exceed 45 amps. Welder and plasma. 400.12- Flexible cords shall not be run thru walls, floors, or ceilings. Remove temp lighting cords and one cord from level 1 to mezz for fan.
|
ELE18-02894
| Final | 1/24/2019 | 1/25/2019 | 1/25/2019 10:21:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Carter Corrections made. Final ok
|
ELE19-00300
| Temporary Service | 1/24/2019 | 1/25/2019 | 1/25/2019 9:37:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson t/s u/g n ok
|
ELE19-00293
| Temporary Service | 1/24/2019 | 1/25/2019 | 1/25/2019 9:04:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt t/s u/g n ok
|
ELE18-04727
| Electrical Rough-In | 1/24/2019 | 1/25/2019 | 1/25/2019 8:33:39 AM | A | PASS |
|
|
Ceiling Inspection, Chad VanOrden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Grid rough in ok cover
|