PLM18-00657
| Other | 1/25/2019 | 1/25/2019 | 1/25/2019 11:06:23 AM | P | PASS |
|
|
This permit was expired for lack of work after 180 days. The homeowner stated the contractor did not return after rough-in and work was completed under plm18-05334.
|
PLM18-00657
| Final | 1/25/2019 | 1/25/2019 | 1/25/2019 10:58:09 AM | A | CANC |
|
|
|
PLM18-00657
| DOC - Permit Expired | 1/25/2019 | 1/25/2019 | 1/25/2019 10:56:32 AM | P | PASS |
|
|
This permit has had not action for more than 180days. A new permit was pulled, plm18-05334. The work was completed under this permit and finaled. The homeowner states the contractor under this permit did not return after the rough-in.
|
PLM19-00356
| Plumbing Rough-in | 1/24/2019 | 1/25/2019 | 1/25/2019 9:28:53 AM | A | FAIL |
|
|
Rough-in on bathroom addition on the second story. There''s 1 shower, lav, and toilet. Phone #: ###-#### Inspection requested via web by Kevin Smith 1. The dwv test failed. 2. The vent for the shower must be rolled above the center line of the drain, 3. The band on the 3" must be shielded. 4. Move the water lines in the cold wall to the warm side of the wall.
|
PLM19-00184
| Final | 1/22/2019 | 1/25/2019 | 1/25/2019 8:48:17 AM | A | PASS |
|
|
Please inspect before 10:30 AM. Homeowner has to leave by 11. Teresa Andrew ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|